Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Dec 13, 2017 18:46:33 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Dec 13, 2017 18:46:33 IST

Blog Entry# 1958141
Posted: Aug 10 2016 (23:53)

4 Responses
Last Response: Aug 17 2016 (01:11)
  
Rail Fanning
0 Followers
1780 views
Aug 10 2016 (23:53)   12279/Taj Express
 

Guest: b2718cd   show all posts
Entry# 1958141            Tags   Past Edits
Is this train cleared for 130 mps, because recently I traveled in it and its performance was awesome so many times runs at an average speed of 130, 120 mps is common for the train, from AGC to MTJ awesome speed 130+...

  
1270 views
Aug 17 2016 (00:59)
Guest: b271ba4   show all posts
Re# 1958141-1            Tags   Past Edits
Anyone

  
1345 views
Aug 17 2016 (01:02)
काम बिलबिला रहा है*^~   36172 blog posts   3154 correct pred (69% accurate)
Re# 1958141-2            Tags   Past Edits
You travelled in Taj Express on August naaa.......
That day Taj took 44 minutes for Dholpur Agra Cant but Bhopal Shatabdi took just 35 minutes.
I think MPS is 110.

  
1399 views
Aug 17 2016 (01:09)
Guest: b271ba4   show all posts
Re# 1958141-3            Tags   Past Edits
Ntes update fake, on that day ntes shows that Taj arrive NZM just 15 min late but in reality Taj express arrives Faridabad Town at 22:05 pm and still standing bcoz jhelum overtake us and after that Andaman link express too arrive behind it, still it was standing, so I decided to take metro to delhi to catch muri express for Panipat, as Jhelum overtake us so no train from NDLS now, and when I leave town station its 22:08 and still it was standing, second fake update was at Jhansi, NTES shows that Taj arrive on time at JHS but it was 20 min delay, mai ntes dekh rha hu to train jhansi me h but platform pr train hi nhi h

  
1333 views
Aug 17 2016 (01:11)
काम बिलबिला रहा है*^~   36172 blog posts   3154 correct pred (69% accurate)
Re# 1958141-4            Tags   Past Edits
Yes NTES give fake updates near the destination of trains but Dholpur Agra is in midway.......
ok we can check it via Race Blog of both trains Shatabdi and Taj, NTES can not be fake for every update.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Dec 23
Trains with ARP 15 Dep on: Thu Dec 28
Trains with ARP 30 Dep on: Fri Jan 12
Trains with ARP 120 Dep on: Thu Apr 12

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.