Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Aug 22, 2017 07:38:49 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Aug 22, 2017 07:38:49 IST

Blog Entry# 1961119  
Posted: Aug 13 2016 (09:46)

3 Responses
Last Response: Aug 13 2016 (11:53)
  
Rail News
0 Followers
777 views
Commentary/Human InterestSR/Southern  -  
Aug 13 2016 (09:44)   Travel on south-bound trains to be faster by at least 1 hr from Oct 1
 

rdb*^   131727 news posts
Entry# 1961119   News Entry# 277077         Tags   Past Edits
Chennai: From October 1, train travel from Chennai to any southern TN destination is bound to be faster by 30 minutes to 1 hour. Southern Railway general manager Vashishtha Johri on Friday said a majority of trains from Chennai Egmore and Central would be speeded up as doubling of Chennai-Madurai section is nearing completion.
The first step was taken on Friday when officials announced that two pairs of trains, the Chennai-Rameswaram Express and Chennai-Jodhpur Express would be upgraded to superfast status, increasing the average speed to more than 55 kmph and bringing down the journey time by at least one hour each.
As
...
more...
TOI reported a month ago, almost all trains from places like Madurai, Trivandrum, Trichy and Guruvayur had the capacity to reach Chennai at least an hour before schedule. They were detained at intermediate stations to kill time. Officials didn't decrease journey time to give cushion for rare en-route failures, resulting in wastage of crores of rupees on electrification and doubling. A km of doubling with electrification costs about 8 crore.Less than 100km of the electrified 497km Chennai-Madurai section remains to doubled. Rail Vikas Nigam Ltd, the railways' engineering arm, is completing the remaining work at pace. The average speed of trains increased after the Chennai-Villupuram section, a major bottleneck, was doubled.
After the report appeared, senior officials made inspections and discovered the extraordinary cushion time given to trains. A peculiar case of trains arriving Chennai on time despite track failure or delays due to derailment was noted by people like the chief passenger transportation manager and chief operations manager. Special committees were formed to cut down the cushion time and pass the benefit to passengers, Johri acknowledged on Friday.He stressed that the zone would concentrate on providing passenger amenities like escalators at the Mass Rapid Transit System (MRTS) stations in Chennai. Divisional Railway Manager Anupam Sharma said Chepauk and Chintadripet stations would get new escalators in the next eight months and speed restrictions on the section would continue till November.
Conversion of Tambaram into the city third terminal would be completed by October, Johri said.

  
Aug 13 2016 (09:46)
rdb*^   31718 blog posts   384900 correct pred (81% accurate)
Re# 1961119-1            Tags   Past Edits
Good and
additionally,,
Conversion of Tambaram into the city third terminal would be completed by October, Johri said.

  
1452 views
Aug 13 2016 (10:17)
Rail Fanning~   2722 blog posts
Re# 1961119-2            Tags   Past Edits
Good move by SR....hope they cut down on the excessive travel time and slack time for other trains also

  
1381 views
Aug 13 2016 (11:53)
pslkumar   335 blog posts
Re# 1961119-3            Tags   Past Edits
good move..

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Fri Sep 1
Trains with ARP 15 Dep on: Wed Sep 6
Trains with ARP 30 Dep on: Thu Sep 21
Trains with ARP 120 Dep on: Wed Dec 20

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.