Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Oct 19, 2017 18:39:03 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Oct 19, 2017 18:39:03 IST

Blog Entry# 1963565
Posted: Aug 15 2016 (17:23)

1 Responses
Last Response: Aug 15 2016 (17:23)
  
Rail News
0 Followers
649 views
Other News
Aug 15 2016 (17:17)   Railways to float Cabinet note for development fund | Business Standard News
 

For Better Managed Indian Railways~   948 news posts
Entry# 1963565   News Entry# 277293         Tags   Past Edits
The railways ministry is set to float a Cabinet note soon for creating the Railways of India Development Fund, anchored by the World Bank, which would be used for modernisation of rail infrastructure in the country.
The proposal has already got a go-ahead from the finance ministry. “We would soon float a Cabinet note for setting up the fund, which would be up for inter-ministerial consultation,” said an official close to the development. According to media reports, the initial corpus of the fund would be around $5 billion and it is likely to be operational by the first half of 2017.
Indian
...
more...
Railways is planning to invest $142 billion in the next five years, as part of the plan by the Narendra Modi-led government to improve the efficiency of the national carrier. The fund would also be used to access various new technologies in the sector. “Our idea is to get part of this plan funded by multilateral bodies, and the World Bank that has global experience and access to technology is a good partner,” Prabhu said about the fund after a meeting with bank officials in January. The fund would provide financing for infrastructure projects of the railways and also invest in debt and equity in projects with private-sector partnership.
The World Bank is already debt funding part of the eastern arm of the ambitious Dedicated Freight Corridor (DFC) project, which was cleared in three tranches. The eastern DFC is to be 1,840-km long, from Ludhiana to Kolkata. The World Bank is supporting it as a series of projects in which three sections with a total route length of 1,146 km will be implemented. The World Bank board had in 2011 approved the first tranche of $975 million loan for the 343-km Khurja-Kanpur section already under implementation. In April 2014, the bank approved the second tranche of the loan of $1.1 billion for the section covering 402 km from Kanpur to Mughal Sarai. The third tranche of $650 million was cleared in July 2015.
The eastern and western arms of the DFC project are expected to help India increase the railways’ transportation capacity by building high-capacity and high-speed dedicated freight corridors along the Golden Quadrilateral. Currently, the rail routes connecting the quadrilateral between Delhi, Mumbai, Chennai and Kolkata account for 16 per cent of the railway network’s length but carry 60 per cent of India’s total rail freight.
FOR MODERN TIMES
The proposal has got a go-ahead signal from the finance ministry
Initial corpus of the fund would be around $5 billion
Likely to be operational by the first half of 2017
Indian Railways is planning to invest $142 billion in the next 5 years
The World Bank is already debt funding part of the eastern arm of DFC project
The eastern DFC is to be 1,840-km long, from Ludhiana to Kolkata
The World Bank board had in 2011 approved the first tranche of $975 million loan
In April 2014, the bank approved the second tranche of the loan of $1.1 billion
The third tranche of $650 million was cleared in July 2015

  
2223 views
Aug 15 2016 (17:23)
©The Dark Lord™~   8498 blog posts   2 correct pred (67% accurate)
Re# 1963565-1            Tags   Past Edits
142 Billion $$$$!!! These figures sometimes seems unrealistic to me. A whole new Railway System can be built with that that much money.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Oct 29
Trains with ARP 15 Dep on: Fri Nov 3
Trains with ARP 30 Dep on: Sat Nov 18
Trains with ARP 120 Dep on: Fri Feb 16

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment" have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are an integral...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.