Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Aug 21, 2017 01:06:26 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Aug 21, 2017 01:06:26 IST

Blog Entry# 1964070  
Posted: Aug 16 2016 (10:21)

57 Responses
Last Response: Sep 05 2016 (15:48)
  
General Travel
0 Followers
5864 views
Aug 16 2016 (10:21)   12553/Vaishali SF Express (PT)
 

Rahul Yadav   151 blog posts   1 correct pred (33% accurate)
Entry# 1964070            Tags   Past Edits
What about punctuality of 12553/12554 Vaishali Superfast?
Do you agree this that when it previously runs via LJN the punctuallity was better than now, as at LJN reversal of train takes place and E-Loco was get attached to Vaishali SF Express but now it is running via LKO so no revarsal no loco change only one loco WDP-4 of SGUJ shed from BJU - NDLS - BJU but we can not say what is real problem D-loco or E-loco or Signals???
Then how coaching depot of BJU say's "Some trains are better than
...
more...
Rajdhani" Ex-Vaishali SF Express.

38 posts - Aug 2016

2 posts - Sun Sep 04, 2016

12 posts - Mon Sep 05, 2016

  
1278 views
Sep 05 2016 (15:27)
The train not taken~   2645 blog posts
Re# 1964070-57            Tags   Past Edits
Not always sir. For electric locos, you should consider the power transmission losses right from the power plant til the loco, which will involve 100s of km of OHE wire. When you consider all these factors, there is not much difference in the efficiency between a eloco and a disco.
There are a lot of factors which determine which is more efficient. IR is looking at one side of the coin and there are equally many more people who are also against electrification for the same reason. Its not easy to make a generalised conclusion in this argument.

  
1260 views
Sep 05 2016 (15:38)
The train not taken~   2645 blog posts
Re# 1964070-58            Tags   Past Edits
Your logic about better acceleration will be correct when, instead of running a train with a fixed TT, you tell the LP to run it as fast as he can while obeying signals. In that case, definitely a e loco train will be faster. But here, that is not the case. The train has a fixed time table and no matter how far it accelerates, it cannot depart at a station earlier than its schedule and no matter how early it arrives at a station, it cannot move onto the platform until it gets clearance.
Aur Vaishali ka average speed sirf 55 kmph hai and on an average, the highest average speeds between halts is 77 kmph,which
...
more...
is very easy for an EMD to achieve.
IR mein Gatimaan aur BPL shatabdi hi do trains hai jo loco par dependent hai schedule ke liye. Baaki sab trains sirf signaling and route congestion ki wajah se itne slow aur delayed chal rahe hai. Almost all of IR's locos are running far below what they are capable of.

  
1229 views
Sep 05 2016 (15:40)
Rahul Yadav   151 blog posts   1 correct pred (33% accurate)
Re# 1964070-59            Tags   Past Edits
Ya, but I'm nit generalizing any one about efficiency, generalizing the punctuality of Vaisahli SF is better with WAP-4 than theWDP-4B/4D slightly e-loco better than d-loco while WDP-4B/4D is also good engine.

  
1350 views
Sep 05 2016 (15:46)
Devashish Gupta   26 blog posts
Re# 1964070-60            Tags   Past Edits
Sir ji, sirf e-loci laga dene se punctuality nhi ayegi kyonki track ki MPS to utni hi hai. Abhi bju- gkp-lko section ka MPS 100 se 110 hai, utni speed to D-loco me bhi hoti hai. Isliye ab time aa gaya hai ki section ki MPS badhayi jaye aur is section ko class A track me upgrade kiya jaye.

  
1357 views
Sep 05 2016 (15:48)
Rahul Yadav   151 blog posts   1 correct pred (33% accurate)
Re# 1964070-61            Tags   Past Edits
Upgrade ab IR ko karna hai wahi jane.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Aug 31
Trains with ARP 15 Dep on: Tue Sep 5
Trains with ARP 30 Dep on: Wed Sep 20
Trains with ARP 120 Dep on: Tue Dec 19

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.