Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sun Sep 24, 2017 01:44:49 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun Sep 24, 2017 01:44:49 IST

Blog Entry# 1964778  
Posted: Aug 16 2016 (22:01)

5 Responses
Last Response: Aug 18 2016 (12:57)
  
Rail News
0 Followers
2466 views
New Facilities/TechnologyNR/Northern  -  
Aug 16 2016 (20:42)   Railways’ All New 3-Tier Humasafar Express Coming Soon. Here’s a Look at Its Features.
 

☆गोंडा इलेक्ट्रिक शेङ ■☆*^~   6731 news posts
Entry# 1964778   News Entry# 277385         Tags   Past Edits
Indian Railways will soon roll out the 3-tier Humsafar Express train with brand new features, giving a huge boost to the middle class.
Railway Minister Suresh Prabhu had announced the launch of this train in his Rail
Budget speech earlier this year.
Humsafar Express is proposed to be a fully air conditioned 3-tier service for
reserved
...
more...
passengers.
The Minister had also said the train would ensure cost recovery by means of tariff and non-tariff measures.
Now, the train is almost ready to start service. The final touches are being given to the coaches being manufactured at the Rail Coach Factory in Kapurthala. All the coaches are stainless steel LHB coaches, which are capable of running at 160 km/hr.
Speaking to Financial Express, officials at the factory said: ““The seats have been provided with better padding, and are therefore more comfortable.”
Mobile and laptop charging points have also been provided in the train. Meals will be available on an optional basis.
LED bulbs, CCTVs, fire and smoke detection systems and bio-toilets have been provided in all coaches.
This fully air-conditioned LCB (Linke Hofmann Busch) 3-tier coach train will have all display boards that will also have braille facility for the visually impaired,” the officials said.
These are by no means all the new features on Humsafar Express. Officials have said all attempts will be made to make the train more comfortable for passengers.

  
1406 views
Aug 16 2016 (22:01)
dj20funky   1 blog posts
Re# 1964778-1            Tags   Past Edits
Let us see how long does it take to be reality

  
1305 views
Aug 16 2016 (22:51)
srinivasvasanthi~   4047 blog posts   15 correct pred (54% accurate)
Re# 1964778-2            Tags   Past Edits
கன்னியாகுமரி - சென்னை கம்ஸபர் இயக்க கேட்டுக்கொள்கிறேன்.
Requested to operate Chennai -Kanniyakumari Humsafar express early.

  
1377 views
Aug 17 2016 (08:53)
HS GD SKD pride of NER~   3213 blog posts   74 correct pred (78% accurate)
Re# 1964778-3            Tags   Past Edits
Bhai is site pe likha hai 1st humsafar Patna ANVT ke beech chalegi par baat to GKP NDLS ki hui thi na. To sach aakhir kya hai

  
2850 views
Aug 18 2016 (12:22)
Nerians~   239 blog posts
Re# 1964778-4            Tags   Past Edits
Train thodi na barbaad karni hai patna se chala ...

  
2863 views
Aug 18 2016 (12:57)
RFshivam~   331 blog posts   42 correct pred (64% accurate)
Re# 1964778-6            Tags   Past Edits
kyu konsi train barbad ho gayi patna se chal ke. tell me.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed Oct 4
Trains with ARP 15 Dep on: Mon Oct 9
Trains with ARP 30 Dep on: Tue Oct 24
Trains with ARP 120 Dep on: Mon Jan 22

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2409730
    Sep 15 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment" have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are an integral...
  • Entry# 2390218
    Aug 25 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.