Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Oct 17, 2017 03:42:35 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Oct 17, 2017 03:42:35 IST

Blog Entry# 1968840
Posted: Aug 21 2016 (10:50)

1 Responses
Last Response: Aug 21 2016 (10:50)
  
Rail News
0 Followers
596 views
Commentary/Human InterestNR/Northern  -  
Aug 20 2016 (22:47)   Much awaited electric train starts by year-end
 

rdb*^   132804 news posts
Entry# 1968840   News Entry# 277725         Tags   Past Edits
If all goes well, the much- awaited electric train to run between Haridwar and Dehradun would start by the end of this year.
The electrification of railway line is almost done and the report has been sent to the Commissioner of Safety for review, said the General Manager of the Northern Railway, AK Puthiya, who came to Haridwar on Friday for inspection. He along with DRM Pramod Kumar and other railway officials reviewed the works undertaken by the authorities and asked them to hasten the incomplete works.
The GM Puthiya said only the
...
more...
safety review report is awaited and as soon as the consent is received from the concerned department, after the trial run, the train would be made available for the people of the two cities. He said, “Till now trains with 12 to 14 bogies have run, but now longer trains with 18 coaches would run on this route.” Up to Rishikesh, 18 coach trains would run from now onwards added Puthiya.
In a step towards modernization, the foot overbridge made during Ardh Kumbh mela would soon have four lifts and three-pier escalator.
The GM said that efforts were on to start a train connecting Rishikesh with Karnprayag for which 57 hectares of land had already been given by the forest department and private lands of 169 hectares had been acquired.
“A PSU is taking care of this project through dialogue between forest and state government-empowered committee. In the first phase, the line would be drawn till New Rishikesh where a terminal would be developed. Rest of the works would be undertaken after getting consent from the forest department. Lot of clearances from forest department is involved and tunnel work would take longer time. The work would start within two months,” said GM.
On the issue of doubling of the railway line between Haridwar and Luxor, GM said the work would be completed next year. He also inspected Jwalapur railway station and gave his suggestions for its improvement.
Inspecting the platform area, the GM seemed to be satisfied but he suggested improvements outside the platform area. When asked by one of the media persons about the repair or replacement of the historical clock hung on the main tower building of the railway station, the GM said that a similar clock was not available in today’s times. “If you know someone who can repair or get a similar one, inform us,” he said.
Regarding security, he said that the conditions were far better than many other railway stations of the country. Not a single incident was reported in the recent past, said Puthiya.
On Platform 1 of Haridwar railway station, new shade ceiling had been constructed reducing the natural light. The GM suggested that transparent roof sheets should be used to ensure that there is enough light during the day time.
On encroachment of the railway land, he said that from time to time anti-encroachment drive was undertaken after giving legal notices. “This problem prevails all over the country. The state government is supporting us. From time to time, we do remove people who have encroached. It is a continuous process,” he said.

  
1553 views
Aug 21 2016 (10:50)
Mazi IRI   770 blog posts
Re# 1968840-1            Tags   Past Edits
good news...

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Fri Oct 27
Trains with ARP 15 Dep on: Wed Nov 1
Trains with ARP 30 Dep on: Thu Nov 16
Trains with ARP 120 Dep on: Wed Feb 14

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Yesterday (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment" have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are an integral...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.