Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Nov 20, 2017 09:40:22 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Nov 20, 2017 09:40:22 IST

Blog Entry# 1971041
Posted: Aug 24 2016 (07:22)

3 Responses
Last Response: Aug 24 2016 (19:50)
  
Rail News
0 Followers
1248 views
New Facilities/TechnologySCR/South Central  -  
Aug 24 2016 (07:22)   Nandyal-Yerranguntla rail line commissioned
 

rdb*^   132872 news posts
Entry# 1971041   News Entry# 277964         Tags   Past Edits
Railway Minister and Chief Minister flag off Nandyal-Kadapa passenger train
Railway Minister Suresh Prabhakar Prabhu along with Chief Minister N. Chandrababu Naidu, Union Minister for Urban Development M. Venkaiah Naidu and other Ministers commissioned the Nandyal-Yerraguntla railway line and flagged off the Nandyal-Kadapa DEMU passenger through remote video link at the Railway Institute here on Tuesday. The new train No.77401 Nandyal-Kadapa will leave Nandyal at 6 a.m. and reach Kadapa at 9.45 a.m. In return, train No. 77402 Kadapa-Nandyal will leave Kadapa at 10.05 a.m. and reach Nandyal at 1.50 p.m.
Train No.77403
...
more...
Nandyal-Kadapa will leave Nandyal at 2.20 p.m. and arrive Kadapa at 6.05 p.m. In return direction, train No.77404 Kadapa-Nandyal will leave Kadapa at 6.30 p.m. and reach Nandyal at 10.15 p.m.
The trains will stop at Madduru, Koilkuntla, Sanjamala, Nosam, S. Uppalapadu, Jammalamadugu, Prodduturu and Yerraguntla stations.
Connection to capital
Speaking on the occasion, Mr. Prabhu said the new train would connect the Rayalaseema region with the Andhra Pradesh capital. The Nandyal-Yerraguntla line had been laid at a cost of Rs.967 crore.
Stating that the South Central Railway (SCR) would be developed in all spheres, the Minister said that A.P. would get its due from the Centre and the hurdles would be cleared soon. “I am happy to be a Rajya Sabha member from Andhra Pradesh,” Mr. Prabhu said.
The Chief Minister said the new train and the line were a crucial link for the development of Rayalaseema, which was a backward region. The proposal for the line was made in 1996, and it took 20 years for the completion of the project, he said.
Boost for exports
“Many limestone, granite, cement factories and ports will get connected with the new railway line and export will get a boost. The Railway Minister has made a proposal for Memorandum of Understanding (MoU) with A.P., which was accepted immediately. Beautification of railway stations will be made in the State soon,” Mr. Naidu said. He appealed to the Railway Ministry to complete the pending projects, including the three new corridors.
Mr. Venkaiah Naidu said new lines estimated about Rs.18,672 crore and doubling of lines, estimated at Rs. 23,137 crore were under examination. He stressed the need for coordination among the State and the Central governments for overall development.
The Minister said that about 41 lakh passengers travelled through SCR for Krishna Pushkaram, and thanked the General Manager, Vijayawada Divisional Railway Manager and the Krishna Pushkaram Officer on Special Duty (OSD) for making good arrangements for the event. Ministers Kollu Ravindra, Prathipati Pulla Rao, Parliament member Gokaraju Gangaraju and railway officials participated.
A.P. will get its due from the Centre and hurdles will be cleared soon
Suresh Prabhakar Prabhu
Railway Minister

  
2925 views
Aug 24 2016 (07:22)
rdb*^   31851 blog posts   408615 correct pred (82% accurate)
Re# 1971041-1            Tags   Past Edits
Congrats!

  
3040 views
Aug 24 2016 (07:37)
✿ఛుక్ 🚃 ఛుక్ 🚃 రైలు✿~   4056 blog posts   152 correct pred (71% accurate)
Re# 1971041-2            Tags   Past Edits
Is there any detailed TT OF these trains....in ntes its not showing between ya - hx stns

  
2443 views
Aug 24 2016 (19:50)
gopalfirst   81 blog posts
Re# 1971041-3            Tags   Past Edits
thankyou sir, many many thanks to you sir, i am very very happy, you given train numbers,from nandyal to cuddapah two set train numbersand train times train numbers[77401 77402 77403 77404] no any where mensioned train numbers,, train timings also sir, from 7 40pm till hear sir. i am reading full railway news from 7 40pm to till hear[meen thistime]sir. any how once again for given train numbers, train timings sir.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Nov 30
Trains with ARP 15 Dep on: Tue Dec 5
Trains with ARP 30 Dep on: Wed Dec 20
Trains with ARP 120 Dep on: Tue Mar 20

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.