Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri Nov 24, 2017 07:43:43 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Nov 24, 2017 07:43:43 IST

Blog Entry# 1971554
Posted: Aug 24 2016 (18:24)

18 Responses
Last Response: Aug 25 2016 (11:33)
  
Rail News
0 Followers
3578 views
Aug 24 2016 (18:18)   Cabinet approves 9 railway network expansion projects worth over Rs 24,000 crore
 

Indian railways Project Swarn is great idea^~   979 news posts
Entry# 1971554   News Entry# 278079         Tags   Past Edits
In a major push to give a boost to the infrastructure sector in the country, the Cabinet Committee on Economic Affairs (CCEA), chaired by the Prime Minister Narendra Modi, has given its approval for nine projects worth Rs 24,374.86 crore in nine States for expansion of railway network and connectivity across the country.
This included a project in Assam for the construction of a second railway line (176 km) between New Bongaigaon and Kamakhya with an expenditure of Rs 2,586.85 crore. The second in Jharkhand for construction 3rd line between Kharagpur (Nimpura) and Adityapur (132 km) costing Rs 1,483.36 crore.
In
...
more...
the States of Chhattisgarh and Maharashtra the construction of 3rd line between Rajnandgaon-Nagpur (Kalumna) (228.3 km) in Rajnandgaon district of Chhattisgarh and Gondia, Bhandara and Nagpur districts in Maharashtra would cost Rs 2,193.53 crore.
In the States of Uttar Pradesh and Madhya Pradesh the construction of 3rd line between Mathura and Jhansi (273.80 km) and construction of 3rd line between Jhansi and Bina (152.57 km) would cost Rs 4,377.13 crore and Rs 2,273.84 crore, respectively.
The sixth project is in the States of Madhya Pradesh and Maharashtra for the construction of 3rd line between Itarsi and Nagpur (280 km) costing an estimated Rs 2,882.94 crore.
In Telangana and Maharashtra the construction of 3rd line between Ballarshah and Kazipet (287.67 km) would cost Rs 2,403.22 crore.
The construction of 3rd line between Vijaywada and Gudur (287.67 km) in Andhra Pradesh is estimated to cost Rs 3,875.68 crore.
The final project in Odisha and Chhattisgarh for the construction of 4th line between Jharsuguda and Bilaspur (206 km) will cost Rs 2,298.31 crore.
Besides facilitating the travel by easing the traffic bottlenecks, the approved lines would help the upcoming industries in the region and additional transport capacity to meet their requirements.
The goods trains supplying foodgrains from one region to another, various industries, mines, coal fields and power plants will have additional transport capacity through these lines resulting in more revenues to Indian Railways.

13 posts - Wed Aug 24, 2016

  
1516 views
Aug 24 2016 (21:14)
srinivasvasanthi~   4144 blog posts   15 correct pred (54% accurate)
Re# 1971554-14            Tags   Past Edits
No SWR and SR routes are trebled.Chennai to Jolarpettai - Bangalore and Jolarpettai to Coimbatore& Shoranur routes have to be trebled early.

  
1965 views
Aug 24 2016 (21:22)
riz339~   2839 blog posts   113 correct pred (57% accurate)
Re# 1971554-15            Tags   Past Edits
WR ,NWR , SWR, SR are totally neglected
There should be balanced, politically neutral decisions required for development
Congestion in every zone, state

  
1996 views
Aug 24 2016 (21:26)
Sk Mangla*^~   1350 blog posts   90080 correct pred (98% accurate)
Re# 1971554-16            Tags   Past Edits
ADI-Mehsana- Palanpur single BG track has become a joke..
Palanpur -AII doubling is taking endless time..
Marwar-Luni-Ju-Merta- Degana Doubling !!! God knows when...

  
1467 views
Aug 25 2016 (11:32)
Mr Wayne😎©®🍺~   2727 blog posts   127 correct pred (75% accurate)
Re# 1971554-17            Tags   Past Edits

  
1465 views
Aug 25 2016 (11:33)
Mr Wayne😎©®🍺~   2727 blog posts   127 correct pred (75% accurate)
Re# 1971554-18            Tags   Past Edits
CPR-TRG connecting NER to ECR has also been approved...expected to completed after 4-5 years. Track length 53Kms approx
Posted thru RailCal

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Dec 4
Trains with ARP 15 Dep on: Sat Dec 9
Trains with ARP 30 Dep on: Sun Dec 24
Trains with ARP 120 Dep on: Sat Mar 24

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.