Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri Aug 18, 2017 10:46:33 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Aug 18, 2017 10:46:33 IST

Blog Entry# 1971554  
Posted: Aug 24 2016 (18:24)

18 Responses
Last Response: Aug 25 2016 (11:33)
  
Rail News
0 Followers
3173 views
Aug 24 2016 (18:18)   Cabinet approves 9 railway network expansion projects worth over Rs 24,000 crore
 

Railway privatisation is must^~   977 news posts
Entry# 1971554   News Entry# 278079         Tags   Past Edits
In a major push to give a boost to the infrastructure sector in the country, the Cabinet Committee on Economic Affairs (CCEA), chaired by the Prime Minister Narendra Modi, has given its approval for nine projects worth Rs 24,374.86 crore in nine States for expansion of railway network and connectivity across the country.
This included a project in Assam for the construction of a second railway line (176 km) between New Bongaigaon and Kamakhya with an expenditure of Rs 2,586.85 crore. The second in Jharkhand for construction 3rd line between Kharagpur (Nimpura) and Adityapur (132 km) costing Rs 1,483.36 crore.
In
...
more...
the States of Chhattisgarh and Maharashtra the construction of 3rd line between Rajnandgaon-Nagpur (Kalumna) (228.3 km) in Rajnandgaon district of Chhattisgarh and Gondia, Bhandara and Nagpur districts in Maharashtra would cost Rs 2,193.53 crore.
In the States of Uttar Pradesh and Madhya Pradesh the construction of 3rd line between Mathura and Jhansi (273.80 km) and construction of 3rd line between Jhansi and Bina (152.57 km) would cost Rs 4,377.13 crore and Rs 2,273.84 crore, respectively.
The sixth project is in the States of Madhya Pradesh and Maharashtra for the construction of 3rd line between Itarsi and Nagpur (280 km) costing an estimated Rs 2,882.94 crore.
In Telangana and Maharashtra the construction of 3rd line between Ballarshah and Kazipet (287.67 km) would cost Rs 2,403.22 crore.
The construction of 3rd line between Vijaywada and Gudur (287.67 km) in Andhra Pradesh is estimated to cost Rs 3,875.68 crore.
The final project in Odisha and Chhattisgarh for the construction of 4th line between Jharsuguda and Bilaspur (206 km) will cost Rs 2,298.31 crore.
Besides facilitating the travel by easing the traffic bottlenecks, the approved lines would help the upcoming industries in the region and additional transport capacity to meet their requirements.
The goods trains supplying foodgrains from one region to another, various industries, mines, coal fields and power plants will have additional transport capacity through these lines resulting in more revenues to Indian Railways.

13 posts - Wed Aug 24, 2016

  
1464 views
Aug 24 2016 (21:14)
srinivasvasanthi~   4019 blog posts   13 correct pred (50% accurate)
Re# 1971554-14            Tags   Past Edits
No SWR and SR routes are trebled.Chennai to Jolarpettai - Bangalore and Jolarpettai to Coimbatore& Shoranur routes have to be trebled early.

  
1812 views
Aug 24 2016 (21:22)
riz339~   2690 blog posts   113 correct pred (58% accurate)
Re# 1971554-15            Tags   Past Edits
WR ,NWR , SWR, SR are totally neglected
There should be balanced, politically neutral decisions required for development
Congestion in every zone, state

  
1843 views
Aug 24 2016 (21:26)
Sk Mangla*^~   1342 blog posts   78438 correct pred (98% accurate)
Re# 1971554-16            Tags   Past Edits
ADI-Mehsana- Palanpur single BG track has become a joke..
Palanpur -AII doubling is taking endless time..
Marwar-Luni-Ju-Merta- Degana Doubling !!! God knows when...

  
1387 views
Aug 25 2016 (11:32)
Mr Wayne😎©®🍺~   2577 blog posts   127 correct pred (74% accurate)
Re# 1971554-17            Tags   Past Edits

  
1386 views
Aug 25 2016 (11:33)
Mr Wayne😎©®🍺~   2577 blog posts   127 correct pred (74% accurate)
Re# 1971554-18            Tags   Past Edits
CPR-TRG connecting NER to ECR has also been approved...expected to completed after 4-5 years. Track length 53Kms approx
Posted thru RailCal

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Aug 28
Trains with ARP 15 Dep on: Sat Sep 2
Trains with ARP 30 Dep on: Sun Sep 17
Trains with ARP 120 Dep on: Sat Dec 16

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.