Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri Nov 24, 2017 16:57:30 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Nov 24, 2017 16:57:30 IST

Blog Entry# 1972029
Posted: Aug 25 2016 (11:52)

3 Responses
Last Response: Aug 26 2016 (20:41)
  
Rail News
0 Followers
1028 views
Aug 25 2016 (09:21)   Ecological impact study of metro's alignment soon
 

❤ WAP7 ❤~   1107 news posts
Entry# 1972029   News Entry# 278115         Tags   Past Edits
The environmental impact of the new alignment of the metro rail for Pune will be assessed soon.
The standing committee of Pune Municipal Corporation (PMC) on Wednesday approved a proposal to carry out the assessment.
The central government had, in June 2015, given a green signal to the changes in the metro route. The alignment of the route was shifted from JM Road to alongside the Mutha river.
A
...
more...
group of prominent personalities have opposed the new alignment as a part of the route will pass over the river bed. They have filed an environmental interest litigation in the National Green Tribunal against the plan.The tribunal is scheduled to hear it in September.
“The administration has to study if the changes in the alignment are going to have an adverse effect on the environment. We have decided to approach experts. A Delhibased group will conduct the survey for the civic body ,“ Balasaheb Bodke, standing committee chairman, told reporters.
The proposed length of the metro in Pune is 31.51km.It will run on two corridors, the first is a 16.59km route between Pimpri Chinchwad Municipal Corporation and Swargate and the second, a 14.92km route, from Vanaz to Ramwadi.
The revised estimate for the project announced by Delhi Metro Rail Corpora tion has been pegged at Rs 11,522 crore, a hike of Rs 653 crore from the 2014 estimate. The metro rail project for the city cleared a bureaucratic step on Monday when the civic body obtained permission from the railway department.
According to civic officials, the metro rail project would require land from the railway ministry . Laying of railway tracks is expected on this land.
The project is now awaiting a final go-ahead from the Centre. After a clearance from the public finance board and a green signal from the Cabinet, actual ground work will commence.

  
1706 views
Aug 25 2016 (11:52)
srinivasvasanthi~   4144 blog posts   15 correct pred (54% accurate)
Re# 1972029-1            Tags   Past Edits
Mula-Muktha River bund via PUNE Metro line laying are a good idea and i have already suggested in social media .
It has strengthen the River bund and cost of land acqusition are also less.Moreover in the road alignment so many trees have to be cut and execution also tedious in road sector with diversion during execution and reduced road width.
Moreover ,In Chennai MRTS lines are mostly executed on the free land along the Bunkingam canal and lesser part along Adayar River bund.MRTS executed successfully and completed in time because of lesser
...
more...
land acquired for this project.
So wherever possible Pune metro alignment shall be routed via River bund,Rivulets, Canal bund ,Channel bumd and small streams etc.In these route very less Land acquired, traffic block nil and the road width also not reduced.Pune has so many streams in and around Kalyaninagar,Wadgoancherry,Ramwadi areas etc.
Similarly Mula - Muktha River buud alignment/ Stream course Metro Elevated track also executed early without any hurdles and traffic blockages mostly nil in this route.
Early completion of the Pune Metro lines are ensured in the River course route like Chennai MRTS route up to Velacherry mostly along stream course.

  
1141 views
Aug 25 2016 (17:22)
❤ WAP7 ❤~   6688 blog posts   843 correct pred (67% accurate)
Re# 1972029-2            Tags   Past Edits
thanks... i agree with your points... by the way the correct names for Muktha and Wadgaoncherry are Mutha and Wadgaonsheri respectively...

  
953 views
Aug 26 2016 (20:41)
srinivasvasanthi~   4144 blog posts   15 correct pred (54% accurate)
Re# 1972029-3            Tags   Past Edits
OK sir.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Dec 4
Trains with ARP 15 Dep on: Sat Dec 9
Trains with ARP 30 Dep on: Sun Dec 24
Trains with ARP 120 Dep on: Sat Mar 24

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.