Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri Nov 24, 2017 11:15:42 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Nov 24, 2017 11:15:42 IST

Blog Entry# 1973069
Posted: Aug 26 2016 (14:43)

2 Responses
Last Response: Aug 26 2016 (15:08)
  
Rail News
0 Followers
1159 views
NFR/Northeast Frontier  -  
Aug 26 2016 (13:45)   Bogibeel, India’s longest rail-cum-road bridge in Northeast, to be completed by 2018; here’s why it’s special
 

Jayashree ❖ Amita*^   38182 news posts
Entry# 1973069   News Entry# 278214         Tags   Past Edits
Said to be India’s longest rail-cum-road bridge, and possibly Asia’s too, the Bogibeel double-deck bridge is all set to be fully operational by March 2018. The bridge is being built over the Brahmaputra in the Dibrugarh district of Assam, connecting the North and the South banks of the river. Once complete, it will greatly benefit the lesser developed areas of Assam and Arunachal Pradesh.
The lower deck of the bridge will comprise of a two-line railway track and the upper deck will boast of a three-lane road. The total length of the rail-cum-road bridge is 4940m or 4.9 km. The entire project involves laying down 74 km of railway line, including the rail linking on the North and South banks of the
...
more...
river. The rail line will be linked to Chowalkhowa, that is 5.83km from Dibrugarh, on the South Bank and Sisi Borgaon and Sirpani on the North bank. The present estimated cost of the entire Bogibeel bridge project (including the linking from banks) is Rs 4,857 crore.
For the purpose of building the bridge, Indian Railways had to constrict the expanse of the Brahmaputra river from 10 kilometres to 5 kilometres. This involved construction of ‘guide bunds’. ‘Guide bunds’ also help in protecting the barrage (bridge structure) from erosion, control the velocity of river water flow and its tendency to change course. Explains PranavJyoti Sharma, Chief Public Relations Officer of Northeast Frontier Railway, “What was challenging for the Indian Railways was the fact that it (the bridge) is being built over a 5km expanse of the river. You have to train the river to flow under the bridge. It’s no mean feat.”
What else makes the bridge special? Says PranavJyoti Sharma, “This is a 100% welded bridge and we are using technology from firms of Sweden and Denmark. Being 100% welded makes the bridge lightweight. Fully welded girders ensure reduction in weight in comparison with the riveted girders. It also makes the bridge less costly.” “State-of-the-art technology is being used for the construction of this bridge,” he adds.
The bridge, which is being built entirely by the Indian Railways (both rail and road parts), has been under construction for several years now. Its foundation stone was first laid by the then PM Atal Bihari Vajpayee in 2002. The trial runs for trains on the bridge will begin in 2017 and with its expected completion in 2018, the Bogibeel bridge will add one more important chapter to railway connectivity in the Northeast.

  
2052 views
Aug 26 2016 (14:43)
deepakrashikendra~   1179 blog posts
Re# 1973069-1            Tags   Past Edits
one year extension in deadline?

  
1829 views
Aug 26 2016 (15:08)
12301HowrahRajdhaniTheGod~   2209 blog posts   1 correct pred (100% accurate)
Re# 1973069-2            Tags   Past Edits
Rly planning Makum-Dangari Line Extension upto Chinese borber at Namcha Gram [20 kms from Namcha Barwa peak(7756 mtrs above msl)].

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Dec 4
Trains with ARP 15 Dep on: Sat Dec 9
Trains with ARP 30 Dep on: Sun Dec 24
Trains with ARP 120 Dep on: Sat Mar 24

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.