Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Aug 21, 2017 03:22:29 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Aug 21, 2017 03:22:29 IST

Blog Entry# 1973414  
Posted: Aug 26 2016 (21:23)

1 Responses
Last Response: Aug 26 2016 (21:23)
  
Rail News
0 Followers
493 views
Other NewsSR/Southern  -  
Aug 26 2016 (13:14)   Trains to run on Chengannur-Tiruvalla line within 20 days
 

Jayashree   37327 news posts
Entry# 1973414   News Entry# 278208         Tags   Past Edits
The works on the nine-kilometre rail line were completed by the second week of June
Chengannur: Trains will start running on the Chengannur-Tiruvalla rain line within 20 days, doubling of which has been completed. Commissioner of Railways Safety Sudarshan Naik said this after the speed trials conducted on Thursday.
In the speed trials, a train was run on the line at 120 km per hour. The train had been fitted with the oscillation monitoring system (OMS) for evaluating the safety of rail tracks and identifying damage, if any. The trial report will
...
more...
be submitted to the Railway Board soon, the commissioner said.
Sudarshan Naik, who arrived at Chengannur in a special train, took part in the puja held there. He travelled to Tiruvalla in the specially arranged rail trolley to examine the tracks. The speed trials were conducted after that.
The works on the 9-kilometre rail line were completed by the second week of June. After the completion of electrification, a train was operated on the route at low speed. The electrification works were reviewed on August 15.
Apart from Railway officials, station master Eapen Thomas also led the tests.

  
1125 views
Aug 26 2016 (21:23)
Rail Fanning~   2722 blog posts
Re# 1973414-1            Tags   Past Edits
Will this lead to any significant change in time for trains it remains to be seen

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Aug 31
Trains with ARP 15 Dep on: Tue Sep 5
Trains with ARP 30 Dep on: Wed Sep 20
Trains with ARP 120 Dep on: Tue Dec 19

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.