Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Sep 21, 2017 07:05:35 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Sep 21, 2017 07:05:35 IST

Blog Entry# 1975731  
Posted: Aug 29 2016 (18:02)

10 Responses
Last Response: Aug 31 2016 (09:28)
  
Info Update
0 Followers
5327 views
Aug 29 2016 (18:02)   JBP/Jabalpur Junction (6 PFs)
 

waiting for PPI JBP elfication~   3638 blog posts   44 correct pred (50% accurate)
Entry# 1975731            Tags   Past Edits
#jbpnews
#JBPINDBNEWLINESURVEYUPDATES
#JBPSUKRINEWTRAINUPDATE
1- It is now assuming that JBP-Sukrimangela train will start in the month of SEPT. anytime but before running the protest regarding the TT of JBP-Sukri train is raising because WCR has created the TT in such a way that the new train will run for only 1 trip a day from both sides but people are looking
...
more...
forward to atleast 3 trips a day as JBP-Sukri distance is less and max. time for reaching Sukri is 3 hrs so in this way for a full day the new train can take around 3 trips in each end so that passengers can be benefited but lets see what WCR will do.
2- Another year will take for the completion of survey of JBP-INDB direct route via Gadarwara-Budhni-Kannod-Dewas so most probably the full project will complete within 7-8 years approximately and other projects like JBP-Damoh direct new line survey will also start asap
3-Now all running staff specially TTE,HTTE,CTI etc. can stay in cheoki and now they dont have to go to ALD for resting as WCR had taken a private Guesthouse on rent in Cheoki to facilitate their staff and now staff goin frm JBP can stay in COI only and come back by their assigned trains.

3 posts - Mon Aug 29, 2016

2 posts - Tue Aug 30, 2016

  
3512 views
Aug 30 2016 (21:40)
rohit04u   27 blog posts
Re# 1975731-6            Tags   Past Edits
Bhai how did you created a new mind set for jabalpur bina track i would like to say u something very urgently that many years b4 there was a news for jabalpur lalitpur new rail line project which was later dumped into dustbin but if jbp damoh is created by IR then it should get connected to lalitpur bcoz it will be a very big connectivity from delhi to south bound trains bhai this would be big achievement for jabalpur

  
2989 views
Aug 30 2016 (21:59)
Montez~   2758 blog posts   1582 correct pred (61% accurate)
Re# 1975731-7            Tags   Past Edits
The train must atleast take two trips, one in the morning and other in evening

  
3486 views
Aug 30 2016 (22:21)
JBP ET OHE OMG 😲~   14160 blog posts   22 correct pred (43% accurate)
Re# 1975731-8            Tags   Past Edits
I have created this mindset considering the completion of hbp g bg as train going south will come upto bina then instead of turning toward kte has directed towards jbp via damoh aur jbp m rukke ke directly btc g k raste bpq yni et bza line m chali jyngi jisse extra burden & extra preference to bpl will reduce a bit

  
3434 views
Aug 30 2016 (23:47)
rohit04u   27 blog posts
Re# 1975731-9            Tags   Past Edits
Yes correct and this jbp route will also get heavy traffic if jbp connected to lalitpur via damoh from delhi to south bound trains bhai bina has been bypassed for going to north but bhopal cannot get relief bcoz it is in middle of main line let see what railway does take decisions in future bye

  
3487 views
Aug 31 2016 (09:28)
waiting for PPI JBP elfication~   3638 blog posts   44 correct pred (50% accurate)
Re# 1975731-10            Tags   Past Edits
yes if in future JBP will get new line from INDB and Damoh then it will be a great achievement and then JBP will play a significant role of connecting north to south either from INDB/NZM,NDLS and if both these new lines will be constructed within 5-6 years then it will save lots of money of IR and also give faster south route thru JBP-BTC-G-BPQ so hope for the best and foremost now is the BGfication of Sukri-NIR-BTC asap and electrification of remaining stretch of ET-JBP and JBP-COI so lets c how much time it will take to complete and how soon we can see trains passing thru JBP to G and then towards south and elocos on ET-JBP route

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Oct 1
Trains with ARP 15 Dep on: Fri Oct 6
Trains with ARP 30 Dep on: Sat Oct 21
Trains with ARP 120 Dep on: Fri Jan 19

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2409730
    Sep 15 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment" have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are an integral...
  • Entry# 2390218
    Aug 25 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.