Rail News
0 Followers
930 views
New Facilities/TechnologyKR/Konkan  -  
Aug 30 2016 (09:27)   Konkan Railway to start track-doubling, electrification work after the monsoon
 

Design Engineer at Johnson controls~   37 news posts
Entry# 1976193   News Entry# 278515         Tags   Past Edits
Konkan Railway Corporation Ltd (KRCL), is set to enhance line capacity to handle more trains as it starts track-doubling work on its 740-km route after this year’s monsoon. The rail PSUalso plans to electrify its entire network in three years, says its Chairman and Managing Director Sanjay Gupta. Excerpts from an interview with BusinessLine:
What is the present status of doubling and electrification on the Konkan Railway?
We did Bhoomi Pujan about a year ago. The tenders for doubling — patch doubling between Roha and Veer (46 km) — has been awarded in
...
more...
June. However, work will commence after the monsoon.
For electrification, paper work is on. We will be publishing the tender very soon. We hope to start work post monsoon. Financial closure for both the projects has been done. We will be raising money within a month. This will be financed by 30 per cent equity contribution from us and the remaining would be debt, over the next 4-5 years.
What is the estimated cost?
The estimated cost is about ₹300 crore for the patch doubling, cost of electrification would be between ₹700 crore and ₹800 crore for complete electrification of the 740-km length.
Plus, there would be some interest cost during construction that would get added to the project cost. We hope to complete both these things in three years time.
How are you trying to maximise revenue both passenger and freight?
A majority of the traffic originates in the Indian Railways system and either terminates on KRCL or passes through us. We cannot have a tariff system which is separate from that of the Indian Railways. We are like any other zonal railway from that point of view and distributed accordingly.
Besides, the three major ports situated near KRCL — JNPT, Goa port and Mangalore port — serve a hinterland which does not require them to use KRCL. Once other ports such as Jaigarh (Maharashtra) and Karwar (Karnataka) are developed fully, they will feed our railways system and we can get cargo.
What about running more passenger services?
At present, we are close to saturation. Passenger services now require a different focus — Chiplun- Khed has a different requirement, and so does Sawantwadi. Goa is heavy on week-end traffic and nowadays there is no off-season there. All our trains towards Goa — Konkan Kanya, Mandovi, JanShatabdi, Rajya Rani — are full, barring the AC double-decker.
In Jan Shatabdi and Rajya Rani, there is scope for increasing the length of the train, but they originate from Dadar a station which cannot handle rakes longer than 18 coaches, hence there is a limitation
Maybe in two years once the Panvel terminus comes in, additional trains for Pune/Konkan side would start from there. There is demand for day trains from Chiplun/Ratnagiri.
But we need a maintenance slot at the Mumbai end which is not working out. Once Nagothane- Roha on Central Railway and our section gets doubled, a few diesel multiple unit (DMU) services that are already running between Diva and Roha on Central Railway might be extended.
What are your hiring plans?
We are hiring essential category staff such as loco pilots, guards, TTEs and station masters regularly. KRCL is a young organisation. All of us were recruited together and we have virtually no retirement as of now. We also have plans to spread out our future recruitment in a manner so that we are not adversely affected by mass retirements.
What is your debt position as on date?
It was about ₹1,500 crore in FY16.We will be picking up more debt for doubling and electrification of our network.
Our operating ratio as per the definition of the Indian Railways is 80 per cent (KRCL spends 80 paise to earn one rupee) — excellent as per IR standards. Now in FY17, we also have the impact of the Seventh Pay Commission.
What about revenue from projects outside Konkan Railway?
The J&K project has been doing really well. We made a topline of ₹550 crore from the construction of the Kashmir Railway project last year. This year, we will touch a much higher figure and this will last for another 2-3 years. We also have two NTPC projects at Kudgi between Bijapur and Gadag (about ₹400 crore) and at Gadarwara between Itarsi and Jabalpur (₹400-500 crore).
IR has enough shelf of projects and anybody and everybody with experience of rail projects will be occupied for the next many years, especially North East, doubling and new lines as the Government is investing heavily.

  
2825 views
Aug 30 2016 (12:04)
Ashish Sharma~   265 blog posts   928 correct pred (70% accurate)
Re# 1976193-1            Tags   Past Edits
Good Initiative, It will help KonKan Railway as well as Indian Railway to speedup its train which uses the Konkan route. Most importantly electrification will provide Eco friendly mode to traction, which reduce air pollution and save diesel and time.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Sep 2
Trains with ARP 15 Dep on: Thu Sep 7
Trains with ARP 30 Dep on: Fri Sep 22
Trains with ARP 120 Dep on: Thu Dec 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...