Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sun Nov 19, 2017 01:14:22 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun Nov 19, 2017 01:14:22 IST

Blog Entry# 1979659
Posted: Sep 03 2016 (01:51)

2 Responses
Last Response: Sep 03 2016 (01:54)
  
Rail News
0 Followers
846 views
Coach Augmentations
Sep 03 2016 (01:38)   When will all trains get LHB coaches?
 

Atharva45^~   6 news posts
Entry# 1979659   News Entry# 278939         Tags   Past Edits
Rajnish Kumar, Indian Railways, Mechanical Engineer
716 Views
It is a very pertinent question; the long term goal is to have LHB Coaches only.
There is no Self Generating AC coach with LHB DESIGN. It is impractical to have all LHB trains with two power cars requiring a team of technicians to accompany, and having 2x500 kW capacity each for a total need of
...
more...
about 200 kW for a three AC coach train.
The development of this type of coach is envisaged with underslung DG set on SLR. This will be for trains that are not fully AC.
There is no motorized bogie available for other than ICF coaches. Therefore, for Self propelled vehicles it has to remain ICF type. ICF Chennai is working on development of a motorized bogie with speed potential of 160 kmph.
The production of LHB coaches in 2015-16 was about 950. It is being enhanced to 1500 in 2016-17. Full conversion from ICF to LHB type coaches will take 4-5 years.
So ICF coaches will continue for some more time maybe a decade.

  
2122 views
Sep 03 2016 (01:51)
Obi Wan has taught you well~   3108 blog posts   1456 correct pred (72% accurate)
Re# 1979659-1            Tags   Past Edits
"200 Kw for 3 AC"
and on what do fans and lights in sleeper coaches run?? gobar?? :P
the underslung experiment failed before, but IR still wishes to persist with it. While the whole world is moving away from SG as it is inefficient, increases weight of rolling stock and is susceptible to vibration related failures but the mechanical department still sees merit in that

  
2118 views
Sep 03 2016 (01:54)
Atharva45^~   40058 blog posts   2691 correct pred (68% accurate)
Re# 1979659-2            Tags   Past Edits
may be some mistake....

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed Nov 29
Trains with ARP 15 Dep on: Mon Dec 4
Trains with ARP 30 Dep on: Tue Dec 19
Trains with ARP 120 Dep on: Mon Mar 19

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.