Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Sep 21, 2017 10:35:37 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Sep 21, 2017 10:35:37 IST

Blog Entry# 1981570  
Posted: Sep 05 2016 (08:02)

5 Responses
Last Response: Sep 05 2016 (08:19)
  
Rail News
0 Followers
1062 views
IR AffairsNFR/Northeast Frontier  -  
Sep 05 2016 (07:57)   Railways plans to fast-track NE projects
 

12085 ডিব্রুগড় গুৱাহাটী শতাব্দী এক্সপ্রেছ 12086~   415 news posts
Entry# 1981570   News Entry# 279116         Tags   Past Edits
GUWAHATI, Sept 4 - As part of the effort to provide better connectivity in the region and integrate the Railways with the development process of the government, the Railway Ministry has decided to fast-track projects in Assam and the Northeast, with work on double-tracking scheduled to start from next week, while sanction for a second rail bridge over the Brahmaputra river at Saraighat is also expected soon.
Addressing a press meet here today, Union Minister of State for Railways Rajen Gohain termed the doubling of railway tracks as removal of a critical bottleneck in Assam. “The rail line doubling will start from Hojai and the foundation stone will be laid on September 12 by the Chief Minister and me,” he said.
“Within
...
more...
this month itself work (on doubling of tracks) on the other sections such as Bongaigaon to Guwahati via Goalpara will also start. A final location survey (FLS) is also going on for the Bongaigaon-Agyathuri section via Rangia and once this is finished, doubling of tracks on this section will also start,” Gohain said.
The minister added that survey is going on for a second rail bridge at Saraighat over the Brahmaputra. “We expect the sanction to come this year itself and work will start from next year,” he said, adding that another rail bridge over the Brahmaputra at Silghat connecting Tezpur is also under consideration.
Gohain said that surveys have also been approved for new routes in the Salona-Khumtai, Sivasagar-Jorhat and Tezpur-Silghat sections.
The minister said that Rs 7,000 crore has been allocated this year to Northeast India for various railway projects. He also added that the tender process for electrification work from New Jalpaiguri to Guwahati has been carried out. A ‘Rail Neer’ water bottling plant will be set up at Jagiroad and land is being surveyed for exact location, he said.
Gohain said that plans are afoot for a high-end Northeast Safari Train to promote tourism in the region. “I am having the first interaction with Tourism Secretaries of the northeastern states on this matter on September 10 in Guwahati,” he said.
The minister said the Guwahati and Agyathuri railway stations will be upgraded on PPP mode to world class stations. “This is under process. Till the matter is finalised in the near future, the Guwahati station will be upgraded and an executive lounge with airport type facilities will be constructed very soon. Several other stations such as Lumding and Tinsukia will also be upgraded soon,” he said.
The minister added that several new trains have been approved and will start very soon. “These include two full Satabdi trains from Tinsukia to Guwahati and from Naharlagun to Guwahati. A fully AC 3-tier train will also start from Guwahati to Bengaluru via Kolkata,” he added.
The minister said the government has launched a new insurance scheme under which all confirmed and RAC rail passengers will get travel insurance of up to Rs 10 lakh on a premium of only 92 paise.
On freight movements that have been delayed due to siding and terminal bottlenecks, Gohain said “a new policy has been started where private parties can now have their own sidings and terminals for freight movements.”

  
5744 views
Sep 05 2016 (08:02)
uks1955~   1133 blog posts   3 correct pred (50% accurate)
Re# 1981570-1            Tags   Past Edits
एक मिलेटरी स्पेशल डेली दिल्ली के लिए चलनी चाहिए जिससे उन्हें भी आराम मिले और अन्य यात्री भी आराम से यात्रा कर सकें ।

  
5736 views
Sep 05 2016 (08:13)
12085 ডিব্রুগড় গুৱাহাটী শতাব্দী এক্সপ্রেছ 12086~   4899 blog posts   1690 correct pred (73% accurate)
Re# 1981570-2            Tags   Past Edits
Waise bhi Saari Delhi Bound trains Rajdhani BP Mail,Avadh Assam Sab mei Military waale hi Maximum hote hai, BP Mail & Avadh Assam me Ek alag sa Coach bhi hai

  
Agar Military waale chala nagi payenge NF k Development hone k baad dekho

  
Delhi Dibrugarh needs Superfast Connectivity after BP Mail & Avadh Assam leave out 3 DBRG Rajdhani

  
As BP Mail & Avadh Assam both Are Super Crawlers

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Oct 1
Trains with ARP 15 Dep on: Fri Oct 6
Trains with ARP 30 Dep on: Sat Oct 21
Trains with ARP 120 Dep on: Fri Jan 19

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2409730
    Sep 15 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment" have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are an integral...
  • Entry# 2390218
    Aug 25 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.