Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Aug 16, 2017 23:06:42 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Aug 16, 2017 23:06:42 IST

Blog Entry# 1981570  
Posted: Sep 05 2016 (08:02)

5 Responses
Last Response: Sep 05 2016 (08:19)
  
Rail News
0 Followers
945 views
IR AffairsNFR/Northeast Frontier  -  
Sep 05 2016 (07:57)   Railways plans to fast-track NE projects
 

Biplob Kagyung~   397 news posts
Entry# 1981570   News Entry# 279116         Tags   Past Edits
GUWAHATI, Sept 4 - As part of the effort to provide better connectivity in the region and integrate the Railways with the development process of the government, the Railway Ministry has decided to fast-track projects in Assam and the Northeast, with work on double-tracking scheduled to start from next week, while sanction for a second rail bridge over the Brahmaputra river at Saraighat is also expected soon.
Addressing a press meet here today, Union Minister of State for Railways Rajen Gohain termed the doubling of railway tracks as removal of a critical bottleneck in Assam. “The rail line doubling will start from Hojai and the foundation stone will be laid on September 12 by the Chief Minister and me,” he said.
“Within
...
more...
this month itself work (on doubling of tracks) on the other sections such as Bongaigaon to Guwahati via Goalpara will also start. A final location survey (FLS) is also going on for the Bongaigaon-Agyathuri section via Rangia and once this is finished, doubling of tracks on this section will also start,” Gohain said.
The minister added that survey is going on for a second rail bridge at Saraighat over the Brahmaputra. “We expect the sanction to come this year itself and work will start from next year,” he said, adding that another rail bridge over the Brahmaputra at Silghat connecting Tezpur is also under consideration.
Gohain said that surveys have also been approved for new routes in the Salona-Khumtai, Sivasagar-Jorhat and Tezpur-Silghat sections.
The minister said that Rs 7,000 crore has been allocated this year to Northeast India for various railway projects. He also added that the tender process for electrification work from New Jalpaiguri to Guwahati has been carried out. A ‘Rail Neer’ water bottling plant will be set up at Jagiroad and land is being surveyed for exact location, he said.
Gohain said that plans are afoot for a high-end Northeast Safari Train to promote tourism in the region. “I am having the first interaction with Tourism Secretaries of the northeastern states on this matter on September 10 in Guwahati,” he said.
The minister said the Guwahati and Agyathuri railway stations will be upgraded on PPP mode to world class stations. “This is under process. Till the matter is finalised in the near future, the Guwahati station will be upgraded and an executive lounge with airport type facilities will be constructed very soon. Several other stations such as Lumding and Tinsukia will also be upgraded soon,” he said.
The minister added that several new trains have been approved and will start very soon. “These include two full Satabdi trains from Tinsukia to Guwahati and from Naharlagun to Guwahati. A fully AC 3-tier train will also start from Guwahati to Bengaluru via Kolkata,” he added.
The minister said the government has launched a new insurance scheme under which all confirmed and RAC rail passengers will get travel insurance of up to Rs 10 lakh on a premium of only 92 paise.
On freight movements that have been delayed due to siding and terminal bottlenecks, Gohain said “a new policy has been started where private parties can now have their own sidings and terminals for freight movements.”

  
5109 views
Sep 05 2016 (08:02)
uks1955~   1131 blog posts   3 correct pred (50% accurate)
Re# 1981570-1            Tags   Past Edits
एक मिलेटरी स्पेशल डेली दिल्ली के लिए चलनी चाहिए जिससे उन्हें भी आराम मिले और अन्य यात्री भी आराम से यात्रा कर सकें ।

  
5100 views
Sep 05 2016 (08:13)
Biplob Kagyung~   4750 blog posts   1685 correct pred (74% accurate)
Re# 1981570-2            Tags   Past Edits
Waise bhi Saari Delhi Bound trains Rajdhani BP Mail,Avadh Assam Sab mei Military waale hi Maximum hote hai, BP Mail & Avadh Assam me Ek alag sa Coach bhi hai

  
4893 views
Sep 05 2016 (08:14)
Biplob Kagyung~   4750 blog posts   1685 correct pred (74% accurate)
Re# 1981570-3            Tags   Past Edits
Agar Military waale chala nagi payenge NF k Development hone k baad dekho

  
4893 views
Sep 05 2016 (08:18)
Biplob Kagyung~   4750 blog posts   1685 correct pred (74% accurate)
Re# 1981570-4            Tags   Past Edits
Delhi Dibrugarh needs Superfast Connectivity after BP Mail & Avadh Assam leave out 3 DBRG Rajdhani

  
4880 views
Sep 05 2016 (08:19)
Biplob Kagyung~   4750 blog posts   1685 correct pred (74% accurate)
Re# 1981570-5            Tags   Past Edits
As BP Mail & Avadh Assam both Are Super Crawlers

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Aug 26
Trains with ARP 15 Dep on: Thu Aug 31
Trains with ARP 30 Dep on: Fri Sep 15
Trains with ARP 120 Dep on: Thu Dec 14

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.