Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Aug 24, 2017 03:21:30 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Aug 24, 2017 03:21:30 IST

Blog Entry# 1982207  
Posted: Sep 05 2016 (20:03)

3 Responses
Last Response: Sep 07 2016 (22:15)
  
★  General Travel
0 Followers
4263 views
Sep 05 2016 (20:03)   17222/Mumbai LTT - Kakinada Port Express | SUR/Solapur (5 PFs)
 

Solapur Superfast~   1734 blog posts   66 correct pred (72% accurate)
Entry# 1982207            Tags   Past Edits
#TripReport
Date of Journey - 01 Sep 2016
From - Pune Junction
To - Solapur Junction
Train No. - 17222 LTT (Kurla) Kakinada Express
Engine
...
more...
- WDG 3A Kalyan Shed
At 14:15 left office and took PMPML Bus No 115 Hinjewadi - Pune Station and reached Pune Station at 15:15. Display indicator was showing Kakinada has delayed by 30 minutes. Taken my journey ticket from ATVM Machine.
Entered to PF 1, huge of passengers are waiting for Pune Gorakhpur. Pune Indore departed from PF 1 after 10 mins Deccan left from PF 5. I went to PF 2, Koyana came to PF 4 at 15:30 and Udyan on PF 2 at 15:40. Udyan left at 15:55 sharp. As soon as Udyan reached Shivajinagar bridge Koyana departed (As this section is converted from block section to automatic signalling system).
My train arrived Pune at 17:20 on PF 2 and departed at 17:30 i.e. 1 hr delayed. WDG 4 UBL Shed (Ex KJM Shed) hauling Pune Gorakhpur departed at 17:20. Till Daund my train was trailing Gorakhpur Express hence stopped at Loni, Yavat and Patas as line was not clear.
After Patas, train entered into Solapur Division. Both driver as well as Controller goes mad from here (Awesome Controller). From Daund, each and every station WDG 3A is just honking and smoking madly and continuously running at speed of 110 Km/hr. Not a single crossing on this single line section, as other trains are already on loop line for giving side to this late running train.
I was expecting to reach Solapur around 20:30, but surprisingly train reached at 19:50 only. Within 3 hrs 20 mins only. As platform was not available, train was waited at outer for 10 mins and after Shatabdi departs 17222 came to PF 2 of Solapur at 20:00.
I sincerely thanked to driver and Controller of Solapur Division who made me feel of traveling in Shatabdi/Rajdhani type train... _/\_ :)

  
3940 views
Sep 05 2016 (22:20)
Subhash Dhavala*^~   6350 blog posts   4673 correct pred (61% accurate)
Re# 1982207-1            Tags   Past Edits
Bhau....ltt coa and ltt vskp has suparb run between pune and wadi

  
3796 views
Sep 06 2016 (04:53)
Solapur Superfast~   1734 blog posts   66 correct pred (72% accurate)
Re# 1982207-2            Tags   Past Edits
Controller plays important roll here in single line section..

  
Sep 07 2016 (22:15)
Solapur Superfast~   1734 blog posts   66 correct pred (72% accurate)
Re# 1982207-3            Tags   Past Edits
In return journey, 19419 Chennai Ahmedabad Express reached Pune 1 hr before.. hence stopped at Ghorpadi for 35 mins and at outer for 20 mins..

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Sep 3
Trains with ARP 15 Dep on: Fri Sep 8
Trains with ARP 30 Dep on: Sat Sep 23
Trains with ARP 120 Dep on: Fri Dec 22

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.