Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Aug 21, 2017 04:53:53 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Aug 21, 2017 04:53:53 IST

Blog Entry# 2024145  
Posted: Oct 15 2016 (12:23)

7 Responses
Last Response: Oct 15 2016 (20:35)
  
Rail News
0 Followers
2739 views
New Facilities/TechnologyECR/East Central  -  
Oct 15 2016 (12:21)   Double track boon for bridge - More trains between Patna & north
 

~   36 news posts
Entry# 2024145   News Entry# 283069         Tags   Past Edits
Patna, Oct. 14: The railways has decided to double the track passing over the Digha-Sonepur rail-cum-road bridge over the Ganga.
The single-track bridge provides train services between Patna and north Bihar districts across river Ganga.
The doubling of tracks will be done from Patliputra Junction to Pahleja Junction at an estimated cost of Rs 156.09 crore. On February 3, 2016, the first passenger train had passed through this bridge.
East
...
more...
Central Railway (ECR) chief public relations officer Arvind Kumar Rajak said: "The Railway Board has sanctioned the doubling of the Patliputra-Pahleja section with electrification at Rs 156.09 crore. Soon railway engineers will visit the site for inspection and work will start, which will take at least two years."
The railways will execute the doubling and electrification work on the 11-km stretch.
Once doubling is complete, it would be boon for residents travelling from state capital to north Bihar.
The proposal to construct this bridge was mentioned in the Union budget of 1997-98 and at that time, the estimated cost was Rs 600 crore but the expenses have now touched Rs 3,080 crore.
Work on this project was started in 2002 and a road deck was added to the bridge in 2006 when Lalu Prasad was the railway minister.
Though the train service was started in February this year, Prime Minister Narendra Modi had formally inaugurated the service from Vaishali on March 12.
The road deck is still not ready for use because the approach road has not yet been constructed on the Digha and Sonepur sides. Opening the road deck will reduce pressure on the dilapidated Gandh Setu, which at present is the only bridge across river Ganga connecting Patna with north Bihar districts.
The road construction department has handed over the construction of the approach road to its two wings - Bihar State Road Development Corporation (BSRDC) and Bihar Rajya Pul Nirman Nigam Ltd (BRPNNL). BSRDC is looking after the approach road on the south that is the Patna side and BRPNN after the one on the north side that is Sonepur side (Saran).
Fourteen pairs of trains pass through the bridge and once doubling is done, more trains will be added on this route, thus reducing the dependence of commuters on Gandhi Setu, which witnesses frequent snarls.
Even several express trains pass through the bridge and track doubling will further enhance the utility of the bridge.
Some important trains taking the bridge include Dibrugarh Rajdhani Express (12423/12424), Guwahati-Anand Vihar North East Express (12505/12506), Guwahati Anand Vihar Poorvottar Sampark Kranti Express (12501/12502), Jogbani Anand Vihar Seemanchal Express (12487/12488) and Lokmanya Tilak Kamakhya AC Express (12519/1250).
The opening of the bridge has already reduced pressure on three major railway stations - Patna Junction, Danapur railway station and Rajendra Nagar Terminal.
The 4.5-km Digha-Sonepur bridge, inaugurated on February 3, 2002, by then Prime Minister Atal Bihari Vajpayee from a function at Gandhi Maidan, is the longest bridge of Indian Railways over the Ganga.
The railways has also sanctioned a halt station between Ashok Rajpath and Patliputra Junction at an estimated cost of Rs 2.45 crore.

2 posts - Sat Oct 15, 2016

  
17578 views
Oct 15 2016 (15:25)
Guest: 2a4ff354   show all posts
Re# 2024145-3            Tags   Past Edits
Mujhe to ye nahi samajh aa raha hai ki jub bridge bana rahe the tabhi double line kyu nahi banaya inlogo ne!!! Ab phir se doubling or phir se electrification karna padega.

  
17603 views
Oct 15 2016 (15:52)
BAHUBALI IS BRAND~   5517 blog posts   103 correct pred (64% accurate)
Re# 2024145-4            Tags   Past Edits
DOUBLE LINE KE LIYE JAGA CHORE HAI

  
17450 views
Oct 15 2016 (18:03)
Guest: 2a4ff9a6   show all posts
Re# 2024145-5            Tags   Past Edits
Ha bridge ki width kafi hai. 2nd line banne ke baad bhi bahoot jagah bach jayegi.

  
17285 views
Oct 15 2016 (18:06)
PIyUsH SInGH™^~   2033 blog posts   2864 correct pred (74% accurate)
Re# 2024145-6            Tags   Past Edits
Good news

  
17660 views
Oct 15 2016 (20:35)
VIVEK SINGH~   1396 blog posts   744 correct pred (67% accurate)
Re# 2024145-7            Tags   Past Edits
Ye bridge pe load kitna hai abhi ? Passenger trains toh filhaal zyada nahi hai shayd.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Aug 31
Trains with ARP 15 Dep on: Tue Sep 5
Trains with ARP 30 Dep on: Wed Sep 20
Trains with ARP 120 Dep on: Tue Dec 19

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.