Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Jul 24, 2017 20:22:16 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Jul 24, 2017 20:22:16 IST

Blog Entry# 2030936  
Posted: Oct 21 2016 (00:31)

7 Responses
Last Response: Oct 21 2016 (00:50)
  
General Travel
0 Followers
1843 views
Oct 21 2016 (00:31)  
 

AkashNER   20 blog posts
Entry# 2030936            Tags   Past Edits
After the construction of Manak Nagar and Aishbagh bypass route, will Vaishali Express return to NER (Manak Nagar-Aishbagh-Badshah Nagar route) or will it be still operating through LKO NR ?
There was a train swap between LKO NR and LJN NER of Lucknow Mail and Vaishali Express. Vaishali successfully has been operating from NR but Lucknow Mail has still not been originating from NER. What is the reason friends ?

2 posts - Fri Oct 21, 2016

  
1489 views
Oct 21 2016 (00:39)
ps14003   229 blog posts
Re# 2030936-3            Tags   Past Edits
It will not be the only stop then. Badshanagar or gomti nagar will be added too.

  
1507 views
Oct 21 2016 (00:43)
AkashNER   20 blog posts
Re# 2030936-4            Tags   Past Edits
Yes, they will be as before. The plan maybe was to divert the trains from Manak Nagar directly to Aishbagh, and not to LJN. And after Aishbagh it would be usual route without changes. NER proposes doubling till Malhour.

  
894 views
Oct 21 2016 (00:46)
debarathi mandal   4930 blog posts   11457 correct pred (88% accurate)
Re# 2030936-5            Tags   Past Edits
Welcome in IRI group

  
883 views
Oct 21 2016 (00:47)
AkashNER   20 blog posts
Re# 2030936-6            Tags   Past Edits
Thank you. 😊

  
835 views
Oct 21 2016 (00:50)
AkashNER   20 blog posts
Re# 2030936-7            Tags   Past Edits
Just wishing Vaishali returns to its own 'den' NER very soon.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Aug 3
Trains with ARP 15 Dep on: Tue Aug 8
Trains with ARP 30 Dep on: Wed Aug 23
Trains with ARP 120 Dep on: Tue Nov 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.