Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Jul 24, 2017 12:24:56 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Jul 24, 2017 12:24:56 IST

Blog Entry# 2031275  
Posted: Oct 21 2016 (11:59)

4 Responses
Last Response: Oct 21 2016 (17:04)
  
Rail News
0 Followers
2300 views
Other NewsSWR/South Western  -  
Oct 20 2016 (20:14)   Rail link to airport not viable from city centre
 

Design Engineer at Johnson controls~   37 news posts
Entry# 2031275   News Entry# 283546         Tags   Past Edits
Providing a train service up to the Kempegowda International Airport (KIA) could be a better and cheaper alternative to the controversial steel flyover, but the state government seems to have taken little effort to seriously consider the prospect.
Many meetings took place between officials of the Bangalore Development Authority (BDA), the Urban Development Department and the South Western Railway (SWR) over the past year on providing rail connectivity to the KIA, but none resulted in a concrete decision on the project.
Developing a rail link to the airport was one of
...
more...
the initial plans of the government, the SWR and the Bangalore International Airport Ltd (BIAL), as it is a cheaper and faster mode of transport. The SWR took a unilateral decision in 2003-04 to develop the Devanahalli railway station and run special buses from the airport.
The places are just 5 kilometres apart. The railways offered to run train services between Channasandra (near Ramamurthy Nagar and KR Puram in eastern Bengaluru) and Devanahalli stations.
At present, the single track between the two stations is underutilised. Sanjiv Agarwal, Divisional Railway Manager, Bengaluru, told DH that the track could be doubled and later electrified. The project will cost no more than Rs 250 crore. The number of rakes can be determined depending on the number of passengers. Each rake costs Rs 30-35 crore, he said.
Agarwal, however, said that rail connectivity to the airport from the city centre was a challenge as the track between Bengaluru City and Yelahanka stations was over-occupied.
"It is the main track for long-distance trains. There is also shortage of space in the yard to house more trains. But that is not the case from Channasandra," he added.
Traffic expert M N Sreehari said that since railway stations were ready, a train service from Channasandra to Devanahalli could certainly help airport-bound travellers from eastern Bengaluru. To start with, he said, the single track can be used since train traffic is low.
But the chief minister seems to have ignored the cheaper modes of transport. Rail services from Hebbal and Yeshwantpur can also be introduced, Sreehari added.

  
4348 views
Oct 21 2016 (11:59)
Why not three languages in Aadhar~   4284 blog posts   324 correct pred (68% accurate)
Re# 2031275-1            Tags   Past Edits
Never saw a lazy CM, who always denies best solutions. Hope next state govt will implement this.

  
4383 views
Oct 21 2016 (12:16)
sonu sharma   271 blog posts   7 correct pred (78% accurate)
Re# 2031275-2            Tags   Past Edits
politicians will not their share if railway link is developed which they will be getting steel flyover.

  
4491 views
Oct 21 2016 (12:39)
Why not three languages in Aadhar~   4284 blog posts   324 correct pred (68% accurate)
Re# 2031275-3            Tags   Past Edits
Exactly, they should think from praja point of view

  
4069 views
Oct 21 2016 (17:04)
Design Engineer at Johnson controls~   283 blog posts   1 correct pred (50% accurate)
Re# 2031275-4            Tags   Past Edits
One of the worthless CM till date..

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Aug 3
Trains with ARP 15 Dep on: Tue Aug 8
Trains with ARP 30 Dep on: Wed Aug 23
Trains with ARP 120 Dep on: Tue Nov 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.