Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Jan 22, 2018 02:29:36 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Jan 22, 2018 02:29:36 IST

Blog Entry# 2031275
Posted: Oct 21 2016 (11:59)

4 Responses
Last Response: Oct 21 2016 (17:04)
  
Rail News
0 Followers
2887 views
Other NewsSWR/South Western  -  
Oct 20 2016 (20:14)   Rail link to airport not viable from city centre
 

Design Engineer at Johnson controls~   37 news posts
Entry# 2031275   News Entry# 283546         Tags   Past Edits
Providing a train service up to the Kempegowda International Airport (KIA) could be a better and cheaper alternative to the controversial steel flyover, but the state government seems to have taken little effort to seriously consider the prospect.
Many meetings took place between officials of the Bangalore Development Authority (BDA), the Urban Development Department and the South Western Railway (SWR) over the past year on providing rail connectivity to the KIA, but none resulted in a concrete decision on the project.
Developing a rail link to the airport was one of
...
more...
the initial plans of the government, the SWR and the Bangalore International Airport Ltd (BIAL), as it is a cheaper and faster mode of transport. The SWR took a unilateral decision in 2003-04 to develop the Devanahalli railway station and run special buses from the airport.
The places are just 5 kilometres apart. The railways offered to run train services between Channasandra (near Ramamurthy Nagar and KR Puram in eastern Bengaluru) and Devanahalli stations.
At present, the single track between the two stations is underutilised. Sanjiv Agarwal, Divisional Railway Manager, Bengaluru, told DH that the track could be doubled and later electrified. The project will cost no more than Rs 250 crore. The number of rakes can be determined depending on the number of passengers. Each rake costs Rs 30-35 crore, he said.
Agarwal, however, said that rail connectivity to the airport from the city centre was a challenge as the track between Bengaluru City and Yelahanka stations was over-occupied.
"It is the main track for long-distance trains. There is also shortage of space in the yard to house more trains. But that is not the case from Channasandra," he added.
Traffic expert M N Sreehari said that since railway stations were ready, a train service from Channasandra to Devanahalli could certainly help airport-bound travellers from eastern Bengaluru. To start with, he said, the single track can be used since train traffic is low.
But the chief minister seems to have ignored the cheaper modes of transport. Rail services from Hebbal and Yeshwantpur can also be introduced, Sreehari added.

  
5791 views
Oct 21 2016 (11:59)
Hung Election this time~   4660 blog posts   334 correct pred (69% accurate)
Re# 2031275-1            Tags   Past Edits
Never saw a lazy CM, who always denies best solutions. Hope next state govt will implement this.

  
5935 views
Oct 21 2016 (12:16)
sonu sharma   271 blog posts   7 correct pred (78% accurate)
Re# 2031275-2            Tags   Past Edits
politicians will not their share if railway link is developed which they will be getting steel flyover.

  
6001 views
Oct 21 2016 (12:39)
Hung Election this time~   4660 blog posts   334 correct pred (69% accurate)
Re# 2031275-3            Tags   Past Edits
Exactly, they should think from praja point of view

  
5512 views
Oct 21 2016 (17:04)
Design Engineer at Johnson controls~   283 blog posts   1 correct pred (50% accurate)
Re# 2031275-4            Tags   Past Edits
One of the worthless CM till date..

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Feb 1
Trains with ARP 15 Dep on: Tue Feb 6
Trains with ARP 30 Dep on: Wed Feb 21
Trains with ARP 120 Dep on: Tue May 22

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.