Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Jan 18, 2018 20:05:47 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Jan 18, 2018 20:05:47 IST

Blog Entry# 2031312
Posted: Oct 21 2016 (12:24)

1 Responses
Last Response: Oct 21 2016 (12:24)
  
Rail News
0 Followers
728 views
Major Accidents/DisruptionsER/Eastern  -  
Oct 21 2016 (12:22)   Mega Power & Traffic Block between Khana & Galsi stations on 23.10.2016
 

Deepanjan^~   6 news posts
Entry# 2031312   News Entry# 283594         Tags   Past Edits
Mega Power & Traffic Block between Khana & Galsi stations on 23.10.2016
In connection with launching of Girder of Foot Over Bridge at Ishan Chandi Hatt on Barddhaman-Asansol electrified quadruple section, Mega Power & Traffic Block for 5 hours 50 minutes (from 09.45 hrs. to 15.35 hrs.) on both Up lines and 90 minutes (from 11.45 Ma. to 13.15 hit.) on 'all 4 (four) lines' on 23.10.2016 (Sunday) will be necessary from Khana to Galsi station after 12381 Up passes Khana at 09.42 hrs., 11105 Up arrives Galsi and 18628 Dn passes Khana at 11.41 hrs. Consequently, the following arrangements have been made in train running on that day :-
...
more...
RESCHEDULING : (I) 13007 Up Toofan Express will be rescheduled by 70 minutes from Howrah (ii) 05008 Up Howrah-Ramnagar Weekly Express will be rescheduled by 05 (five) hours from Howrah.
• CONTROLLING : (I) 13050 Dn Amritsar-Howrah Express will be suitably controlled en-route for 40 minutes in Asansol Division. (ii) 12326 Dn Nangal Dam-Kolkala Express will be suitably controlled en-route for 10 minutes in Asansol Division. (iii) 11448 Dn Shaktipunj Express will be suitably controlled en-route for 10 minutes in Howrah Division. (iv) 12305 Up Rajdhani Express will be suitably controlled en•route for 10 minutes in Howrah Division.
•SHORT TERMINATION/SHORT ORIGINATION: 53140 Dn Jasidih-Kolkata Passenger leaving on 23.10.2016 from Jasidih (d. 07.00 hrs.) will short terminate at Asansol and 53139 Up Kolkata-Jasidih Passenger levaing on 23.10.2016 (Kolkata dep. 22.25 hrs.) will short originate from Asansol at 0325 hrs. on 24.102016 and will remain cancelled between Kolkata and Asansol.
• SHORT TERMINATION/SHORT ORIGINATION WITH RESCHEDULING : (1) 63516 Dn Asansol-Barddhaman MEMU Passenger (Asansol d. 10.20 hrs.) will short terminate at Durgapur & 63513 Up Barddhaman-Asansol MEMU Passenger (Barddhaman d. 09.50 hrs.) will short originate from Durgapur at 11.15 hrs. with rescheduling by 25 minutes. (ii) 63518 On Asansol-Barddhaman MEMU Passenger (Asansol d. 12.40 hrs.) will short terminate at Durgapur & 63515 Up Barddhaman-Asansol MEMU Passenger (Barddhaman d. 12.05 hrs.) will short originate from Durgapur at 13.30 hrs. with rescheduling by 25 minutes. (iii) 63520 On Asansot-Barddhaman MEMU Passenger (Asansol d. 14.05 hrs.) will short terminate at Durgapur & 63517 Up Barddhaman-Asansol MEMU Passenger (Barddhaman d. 13.15 hrs.) will short originate from Durgapur at 14.55 hrs. with rescheduling by 39 minutes.
• ADDITIONAL STOPPAGES :13007 Up Toofan Express will stop at all stations between Khana and Durgapur.
Divisional Railway Manager, Asansol .
EASTERN RAILWAY

  
18513 views
Oct 21 2016 (12:24)
Deepanjan^~   6431 blog posts   64679 correct pred (89% accurate)
Re# 2031312-1            Tags   Past Edits
ER notification

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Jan 28
Trains with ARP 15 Dep on: Fri Feb 2
Trains with ARP 30 Dep on: Sat Feb 17
Trains with ARP 120 Dep on: Fri May 18

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.