Status on ALJN PF increase work and new modifications in pf numbers of trains...
->A line which was terminal type near to pf3 has been removed and pf3/4 has been extended in both directions i.e. CNB and NDLS side.
->The main platform for CNB bound trains was PF2 but now it is PF3.
->The main platform for NDLS bound trains was PF3 but now...
more... it is PF4.
->EMU,MEMU,BE-ALJN PASS PF changed from PF4 to PF2.
->75kmph TSR has been issued on CNB line.
->100kmph PSR remains the same on NDLS line.
->Loop line for CNB bound is PF2 and Loop line for NDLS bound is PF5.
->Beside the line of PF4 there is a line for goods then PF5 and then PF6.
->PF7 work is in progress while PF5&6 are functional.
-------------------------------------------------- -------------------------------------------------- -------
Some spottings-
# Loco change for BE pass occured from PF3 line.
# Simultaneously two goods train departed towards NDLS.
# NCR track work car were placed at PF7.
# More lights have been placed on PF3&4 making it more feasible for passengers.
# LED lights on PF5&6.
# Smooth functioning of trains on both sides.