Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Jan 22, 2018 06:46:54 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Jan 22, 2018 06:46:54 IST

Blog Entry# 2044735
Posted: Nov 01 2016 (22:00)

8 Responses
Last Response: Nov 15 2016 (16:36)
  
★★★  General Travel
0 Followers
8146 views
Nov 01 2016 (22:00)   11309/Solapur - Miraj Express (UnReserved) | AAG/Angar (2 PFs)

Solapur Superfast~   1918 blog posts   67 correct pred (72% accurate)
Entry# 2044735            Tags   Past Edits
01413 Solapur Miraj Fast Passenger at Angar...

3 posts - Tue Nov 01, 2016

  
6151 views
Nov 02 2016 (20:05)
Solapur Superfast~   1918 blog posts   67 correct pred (72% accurate)
Re# 2044735-4            Tags   Past Edits
Yes.. March 2017 paryant Kurduwadi - Mohol doubling complete hoil..

  
6004 views
Nov 02 2016 (20:08)
मुंबईCSMT Goregaav Harbour Local Soooon^~   1637 blog posts   1 correct pred (100% accurate)
Re# 2044735-5            Tags   Past Edits
GR8

  
Nov 04 2016 (18:34)
Kapil   187 blog posts   139 correct pred (62% accurate)
Re# 2044735-6            Tags   Past Edits
Yes... Work is is going on... But on slow pace...
Find my observations during my travel from kWV to Bhigwan....
Update on Kwv- Bhigwan Doubling,
From Kurduwadi to dhavlas No visible work is seen along the track...
Few
...
more...
km before Kem station .. some ground leveling work is seen...
Some station work and bridge work seen near bhalawani station... Also leveling work seen till Jeur railway over bridge...
No station work seen at Kurduwadi, Jeur, Dhavlas, Kem, stations....
From Jeur to pophalaj intermittent ground leveling is seen along the track...
From pophalaj no work done along the track...
After Pophalaj no work is seen...till bridge on ujni backwater...
Old bridge have facility for second track so no new bridge may be required...
In nearby washimbe area stone cutting and ground leveling is seen nearby Washimbe station on right side...
Till parewadi station intermittent ground leveling and stone cutting seen along track...
After Parewadi ground leveling is seen till Bhigwan...
SUMMERY:
1. Ground leveling and stone cutting going on.
2. Station work for new tracks, platforms, loop lines not seen.
3. All 4 bridges (3 on Ujni backwater and 1 on Bhima river) are seen having spare area to accommodate extra track, steel girders seen at all bridges.

  
5944 views
Nov 05 2016 (12:07)
Solapur Superfast~   1918 blog posts   67 correct pred (72% accurate)
Re# 2044735-7            Tags   Past Edits
Big task here is to construct line and bridges on Ujani Dam Back Water..
It's almost 5 stations from Pophlaj to Bhigwan (both inclusive)..

  
5271 views
Nov 15 2016 (16:36)
Solapur Superfast~   1918 blog posts   67 correct pred (72% accurate)
Re# 2044735-8            Tags   Past Edits
Got extension till Jan 2017..

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Feb 1
Trains with ARP 15 Dep on: Tue Feb 6
Trains with ARP 30 Dep on: Wed Feb 21
Trains with ARP 120 Dep on: Tue May 22

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.