Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sat Jan 20, 2018 03:29:36 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sat Jan 20, 2018 03:29:36 IST

Blog Entry# 2046774
Posted: Nov 03 2016 (15:54)

1 Responses
Last Response: Nov 03 2016 (15:54)
  
Rail News
0 Followers
417 views
Other News
Nov 03 2016 (12:20)   New rail projects bring goodies, but surcharge to hit commuters

Jayashree   38671 news posts
Entry# 2046774   News Entry# 284668         Tags   Past Edits
The Rs 10,947 crore phase 3 of the Mumbai Urban Transport Project (MUTP) and the Rs 9,356 crore Virar-Panvel new suburban corridor will bring about a sea-change in the way Mumbaikars travel, but it will also come with a price on your ticket. Since the Railways is looking at a loan of around Rs 8,000 crore from the World Bank for both the projects, the repayment will have to be done by way of an extra amount called surcharge added to every suburban ticket.
“Currently surcharge component in a ticket is about 18-20 per cent. This we want raised to around 25 per cent but the effect on the commuter would not be very huge. The benefits of these projects would far
...
more...
outweigh any surcharge that the commuter will have to pay. The rest of the Rs 12,000 crore would be raised jointly by the state government and the Railways,” said Mumbai Rail Vikas Corporation managing director Prabhat Sahai.
Ads by Revcontent Her Dad Was Shocked After Checking Her Bank Balance CareerTimes How to Make Rs.45000 Per Week Without a Job in Ernakulam CareerTimes Don't Invest in the Mutual Funds Until You've Seen This! ArthaYantra Both the projects have currently been cleared by NITI (National Institution for Transforming India) Aayog and the Finance Ministry and are awaiting the final nod from the Prime Minister-chaired Cabinet Committee of Economic Affairs (CCEA). The nod is expected to come by the end of November, a section of officials told DNA.
The MUTP phase 3 has projects like the Rs 2,618 crore Panvel-Karjat new suburban line, Rs 3,555 crore Virar-Dahanu adding two lines, the procurement of trains at Rs 2,899 crore and Rs 428 crore for the elevated connector between Airoli and Kalwa.
The Virar-Panvel suburban corridor has the potential to create a completely new urban agglomeration, much like Navi Mumbai.

  
947 views
Nov 03 2016 (15:54)
For Better Managed Indian Railways~   1933 blog posts
Re# 2046774-1            Tags   Past Edits
Surcharge is a good practice, in a way that at least the new loans, associated projects and facilities (trains) shall come due to fulfilment of viability. Even with 18% surcharge, the new trains shall be much more economical and convenient than other means of transport. So it is better to have the project with surcharge rather than not having at all. Every good facility comes at a cost which the user have to bear. Konkan Railway which is a success story, is already inflating distance by 25%/40% without any problem.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Tue Jan 30
Trains with ARP 15 Dep on: Sun Feb 4
Trains with ARP 30 Dep on: Mon Feb 19
Trains with ARP 120 Dep on: Sun May 20

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.