Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sun Jan 21, 2018 22:28:24 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun Jan 21, 2018 22:28:24 IST

Blog Entry# 2049839
Posted: Nov 05 2016 (23:58)

1 Responses
Last Response: Nov 05 2016 (23:58)
  
Rail News
0 Followers
930 views
Other NewsSR/Southern  -  
Nov 05 2016 (15:58)   Mankara railway station to be shut

Jayashree   38675 news posts
Entry# 2049839   News Entry# 284868         Tags   Past Edits
Pathiripala:  The Mankara railway station under the Palakkad Railway Division  will go into history and functioning will be stopped by next March 31. The people of Mankara have been hearing this for a long time and now the Railways have decided to shut the station. The people have protested and wanted the rail authorities to desist from their move to close down the Mankara station. Besides being just another station, it is also one of the oldest railway stations of British Malabar and was constructed by the Viceroy for Mankara Chettoor Sir Shankaran Nair. The Mankara station will be shut with the work on the signal panel and the relay room building, at a cost of Rs 3 crore, being completed. The present 4 station masters and 4 traffic staff will be transferred to other stations. At present, only the Coimbatore-Mangalore and Shornur-Coimbatore Memu passengers express have stops at Mankara. Though...
more...
these trains will continue to stop here at present, very soon this too would be stopped.  Season ticket holders will be hard hit and the ticket counters too will be closed.  The station has been running into loss and the railway authorities say ticket collection for a day comes to only Rs 1500 and Rs 2000 from the station counters. The salary for the 8 employees comes to over Rs 4 lakh. During holidays, the monthly collection from issuing tickets comes to a meager RS 50000. The first move to shut the station came up in 2012

  
1477 views
Nov 05 2016 (23:58)
For Better Managed Indian Railways~   1933 blog posts
Re# 2049839-1            Tags   Past Edits
Cost cutting exercise of IR to overcome the cash crunch seems to have begun in real earnest.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed Jan 31
Trains with ARP 15 Dep on: Mon Feb 5
Trains with ARP 30 Dep on: Tue Feb 20
Trains with ARP 120 Dep on: Mon May 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.