Blog Entry# 2051401
Posted: Nov 07 2016 (12:20)

8 Responses
Last Response: Nov 07 2016 (17:56)
  
Rail News
0 Followers
2848 views
IR AffairsCR/Central  -  
Nov 07 2016 (12:12)   NITI Aayog approves Pune-Kolhapur Rail line Electrification

Yuva Rahul Shortly In Serampore😊😯^~   110 news posts
Entry# 2051401   News Entry# 285037         Tags   Past Edits
Pune: In what is good news for Maharashtra passengers, the NITI (National Institute for Transforming India) Aayog has given its appraisal note for the electrification of the Pune-Miraj-Kolhapur line.
The NITI Aayog’s approval is for the single line, currently in place as well as for the second line that is proposed to be built between the two cities. At current prices, the cost of electrification of the two lines­— totalling 692 kilometres of tracks – would be Rs 513 crore, officials said.
The route, currently a single line, has got congested due to
...
more...
the increase in passenger footfall as well as goods traffic between the two cities and a second line is now an urgent requirement. A sum of Rs 1.27 crore had been allotted for the preliminary engineering and traffic survey for the second line. While Rs 27 lakhs has already been spent on the survey, this year’s railway budget allotted the remaining Rs 1 crore as well in order to complete the survey so that physical work on laying the line could begin.
For the moment, the project looks a win-win situation for passengers as well as the railways. Current calculations show that the project has a rate of retun of 35 per cent, which means we can recoup the entire amount spent in about 3-4 years.
While a second line will allow more passenger trains to run on the route— up from the current 12-18 per day— the real benefits, CR officials said, was for the goods traffic. “Electrification will allow us to run goods trains with a total payload of 5,800 tons. This would be an increase of more than 50 per cent in payload which in turn brings that much more revenue and also saves time. Time saved on a route allows us to add trains” said a senior CR official.

3 posts - Mon Nov 07, 2016

  
1943 views
Nov 07 2016 (14:36)
Hung Election this time~   4660 blog posts   334 correct pred (68% accurate)
Re# 2051401-4            Tags   Past Edits
Funds allotted, but no signs of doubling work on this route.

  
1912 views
Nov 07 2016 (14:41)
For Better Managed Indian Railways~   1933 blog posts
Re# 2051401-5            Tags   Past Edits
Struck in Land Acquisition Hurdles??

  
1937 views
Nov 07 2016 (15:18)
Hung Election this time~   4660 blog posts   334 correct pred (68% accurate)
Re# 2051401-6            Tags   Past Edits
I think no problem with land, CR is quite slow on progress. Another example, one of the oldest BG line between Daund and Kalaburagi(GR) part of bombay-madras line is being doubled now.

  
2594 views
Nov 07 2016 (17:51)
Rail Premi   75 blog posts
Re# 2051401-7            Tags   Past Edits
CR is very very slow compare to other division. Final Location survey, land Acquisition and Tenders are done long time back. Sufficient fund already allocated to this project. Still no ground work started yet. This project it will take 20 yr for compilation, If this kind of delay happen.

  
1402 views
Nov 07 2016 (17:56)
Venkat వెంకట్   3380 blog posts   1 correct pred (100% accurate)
Re# 2051401-8            Tags   Past Edits
Pune corporation elections are nearing. So no surprise we are seeing many announcements like this :)

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Fri Feb 2
Trains with ARP 15 Dep on: Wed Feb 7
Trains with ARP 30 Dep on: Thu Feb 22
Trains with ARP 120 Dep on: Wed May 23

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...