Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri Jul 21, 2017 12:39:51 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Jul 21, 2017 12:39:51 IST

Blog Entry# 2052573  
Posted: Nov 08 2016 (11:34)

9 Responses
Last Response: Jul 18 2017 (18:11)
  
General Travel
0 Followers
3034 views
Nov 08 2016 (11:34)   SGRL/Singrauli (3 PFs)

apsaxena56   129 blog posts   5 correct pred (71% accurate)
Entry# 2052573            Tags   Past Edits
SINGRAULI had 1 platform initially. 2 new platforms were under construction and were to get completed by December 2014.
Railways also announced in last budget doubling of Katni Singrauli line.
can any one from that area guide me whether the 2 additional platforms at Singrauli are ready or not, secondly what is status of this doubling-whether nay work started or still yet to do???

2 posts - Apr 2017

2 posts - Tue Jun 13, 2017

  
837 views
Jun 29 2017 (18:23)
BJ~   2300 blog posts
Re# 2052573-5            Tags   Past Edits
SGRL CPU mein doubling ka khatarnak progress hai... kaafi hilly areas hai..cutting is taking time..
However no structure work has been observed between CPU NUQ

  
860 views
Jun 29 2017 (18:25)
धनबाद मंडल के बिना ECR बेकार है*^~   5432 blog posts   9685 correct pred (74% accurate)
Re# 2052573-6            Tags   Past Edits
SGRL- CPU Section kalank hai ECR Dhn divn ka . Baki sab 4-5 years me ho jayega sgrl-cpu-ghd i think . Bas 4-5 bridges hai poore section me around 500m to 1.2 km

  
793 views
Jun 29 2017 (20:55)
BJ~   2300 blog posts
Re# 2052573-7            Tags   Past Edits
But culverts ke kam bhi start hone baaki hain.
Nuq me traction substation abhi tak nahi bana. Traction ss ke liye 8 kms long transmission line banana tha Wo bhi nahi hai kahin.
Renukut me traction ss ka kam chalu hai. Thoda Structure erection hua hai...baaki kisi station per mujhe traction ss nahi dikha

  
551 views
Jul 01 2017 (18:26)
Guest: 39f70f4a   show all posts
Re# 2052573-8            Tags   Past Edits
And what is the progress of electrification

  
191 views
Jul 18 2017 (18:11)
apsaxena56   129 blog posts   5 correct pred (71% accurate)
Re# 2052573-9            Tags   Past Edits
Has electrification started from New Katni towards Singrauli?/ In fact railways were to complete the work in 3 years since last budget.
please update me.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Jul 31
Trains with ARP 15 Dep on: Sat Aug 5
Trains with ARP 30 Dep on: Sun Aug 20
Trains with ARP 120 Dep on: Sat Nov 18

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.