General Travel
0 Followers
3582 views
Nov 08 2016 (11:34)   SGRL/Singrauli (3 PFs)

apsaxena56   158 blog posts   5 correct pred (71% accurate)
Entry# 2052573            Tags   Past Edits
SINGRAULI had 1 platform initially. 2 new platforms were under construction and were to get completed by December 2014.
Railways also announced in last budget doubling of Katni Singrauli line.
can any one from that area guide me whether the 2 additional platforms at Singrauli are ready or not, secondly what is status of this doubling-whether nay work started or still yet to do???

2 posts - Apr 2017

2 posts - Tue Jun 13, 2017

  
1191 views
Jun 29 2017 (18:23)
BJ~   2594 blog posts
Re# 2052573-5            Tags   Past Edits
SGRL CPU mein doubling ka khatarnak progress hai... kaafi hilly areas hai..cutting is taking time..
However no structure work has been observed between CPU NUQ

  
1227 views
Jun 29 2017 (18:25)
धनबाद मंडल की सोच कोयले से भी काली*^~   5889 blog posts   9809 correct pred (74% accurate)
Re# 2052573-6            Tags   Past Edits
SGRL- CPU Section kalank hai ECR Dhn divn ka . Baki sab 4-5 years me ho jayega sgrl-cpu-ghd i think . Bas 4-5 bridges hai poore section me around 500m to 1.2 km

  
1160 views
Jun 29 2017 (20:55)
BJ~   2594 blog posts
Re# 2052573-7            Tags   Past Edits
But culverts ke kam bhi start hone baaki hain.
Nuq me traction substation abhi tak nahi bana. Traction ss ke liye 8 kms long transmission line banana tha Wo bhi nahi hai kahin.
Renukut me traction ss ka kam chalu hai. Thoda Structure erection hua hai...baaki kisi station per mujhe traction ss nahi dikha

  
913 views
Jul 01 2017 (18:26)
Guest: 39f70f4a   show all posts
Re# 2052573-8            Tags   Past Edits
And what is the progress of electrification

  
625 views
Jul 18 2017 (18:11)
apsaxena56   158 blog posts   5 correct pred (71% accurate)
Re# 2052573-9            Tags   Past Edits
Has electrification started from New Katni towards Singrauli?/ In fact railways were to complete the work in 3 years since last budget.
please update me.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Jan 28
Trains with ARP 15 Dep on: Fri Feb 2
Trains with ARP 30 Dep on: Sat Feb 17
Trains with ARP 120 Dep on: Fri May 18

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.