Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Jan 17, 2018 08:41:39 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Jan 17, 2018 08:41:39 IST

Blog Entry# 2053415
Posted: Nov 09 2016 (06:35)

2 Responses
Last Response: Nov 09 2016 (06:39)
  
Rail News
0 Followers
465 views
Commentary/Human InterestHM/Hyderabad Metro  -  
Nov 09 2016 (06:34)   ‘Metro to chug into city by Ugadi next year’

rdb*^   133024 news posts
Entry# 2053415   News Entry# 285177         Tags   Past Edits
Hyderabad: Ugadi 2017 might finally see the much-awaited Metro Rail chug into the city. But just in case this deadline is missed, the tracks will most certainly be cleared for the Metro by June 2 - also the Telangana Formation Day - assured NVS Reddy, managing director of Hyderabad Metro Rail Limited (HMRL), during a conference in the city on Tuesday.
The plan is to make operational at least two fragments - about 20 kilometres of the total 72-kilometer-long metro rail network - at the earliest, even as completion of the entire project is likely to get pushed back by another 6 to 12 months, he added. The two stretches up for inauguration are Mettuguda to Nagole (8 km-long stretch along corridor
...
more...
I) and Miyapur to S R Nagar (12 km-long stretch along corridor III).
The official date for completion of the entire metro rail project was earlier set as June 2017.
While preparations are on to make these two fragments operational soon, official confess that attempts are on to increase the length of these for better connectivity when the Metro finally rolls out. Experts and commuters are highly apprehensive about the success of these short stretches that do not connect many pockets. While they are trying to push corridor I at least up to Prakash Nagar or Begumpet, attempts are on to take corridor III up to Khairatabad.
"We will certainly roll out the two stretches that we have mentioned are ready. Our effort now is to see if we can open something more. If we can do it and the railway authorities co-operate with us, we will try to extend it further," said Reddy.
At present, test runs are being conducted along the Miyapur- S R Nagar stretch while test runs have been successfully completed on the Nagole- Mettuguda stretch. The stretches have also secured the essential safety certification to start operations 'anytime now'.
HMRL authorities said that majority of the project work on all three corridors are expected to be complete by the end of 2017. "Some work will spill over into 2018. We are trying to sort out the issue of the ISKCON temple at Secunderabad, hoping for some solution in a week. If that is possible, we will be able to connect the Miyapur stretch to Secunderabad station," added Reddy, insisting that the project was running as per schedule.
"Earlier most of the work was on the ground but now most of the work is happening over the pillars, so it is not visible. Almost 70% of the work is completed. Apart from the 6-km stretch in Old City, where we are facing major hurdles, we are on track at all other places," the managing director said.
Incidentally, this is the second time that HMRL has announced the roll out date - the previous one being Ugadi 2016.

  
1086 views
Nov 09 2016 (06:35)
rdb*^   31881 blog posts   422106 correct pred (82% accurate)
Re# 2053415-1            Tags   Past Edits
BOX
Total length of the project: 72 kms
Foundation work completed on: 60 kms
Pillars erected along: 57 kms
Amount of money invested by L&T so far: Rs 11, 500 crore

  
1072 views
Nov 09 2016 (06:39)
rdb*^   31881 blog posts   422106 correct pred (82% accurate)
Re# 2053415-2            Tags   Past Edits
finally! even BMRC started operations on Ugadi

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Jan 27
Trains with ARP 15 Dep on: Thu Feb 1
Trains with ARP 30 Dep on: Fri Feb 16
Trains with ARP 120 Dep on: Thu May 17

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.