Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sat Jan 20, 2018 09:10:28 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sat Jan 20, 2018 09:10:28 IST

Blog Entry# 2053417
Posted: Nov 09 2016 (06:40)

1 Responses
Last Response: Nov 09 2016 (06:40)
  
Rail News
0 Followers
538 views
Crime/AccidentsCMRL/Chennai Metro  -  
Nov 09 2016 (06:37)   Metro extension: Tender floated for elevated line

rdb*^   133024 news posts
Entry# 2053417   News Entry# 285180         Tags   Past Edits
CHENNAI: Commuters could, in a couple of years, be travelling above the congested roads of north Chennai to the rest of the city as Chennai Metro Rail has floated tenders for construction of elevated corridor for 9km phase-1 extension from Washermenpet to Wimco Nagar. Work to build a 2km tunnel, as part of the project, is already under way. The extension project is planned for completion by 2019.
CMRL has floated tenders for construction of a part of the elevated stretch in north Chennai at Toll Gate and Wimco Nagar. It includes building of columns and pile cap that will hold the elevated viaduct for a stretch of about 3km near Toll Gate and Wimco Nagar. The total elevated line is about
...
more...
7km with six stations.
While the line alignment plan and location of the piers would be provided by CMRL, the contractor is expected to handle identification and shifting of utilities at the location where the foundation would be laid, make detailed traffic diversion plan in consultation with the city traffic police and all associated works for a stretch of about 3km between Toll Gate and Wimco Nagar.
The phase-1 extension project, which was approved by the Central government earlier this year, is being built at an estimated cost of Rs 3,770 crores.
CMRL has also released a report on the preliminary investigations conducted at the project site on soil and sub-soil water condition. The study was necessary for laying of foundation for elevated stretch and also for tunnel boring purposes. While Chennai's soil has mostly clay, shale and sandstone, ground studies have shown sandy areas like Tiruvottiyur and New Washermenpet.
Construction for 2km underground stretch started after chief minister J Jayalalithaa laid the cornerstone in July. Preliminary work of the project started towards the end of 2015, much before it received Centre's nod for fund allocation. Metro officials began land acquisition process for the construction of the line and issued notices to residents who had objections. Officials wanted to clear all the hurdles for construction so that work could begin immediately once the project was cleared by the Centre. Officials said as the viaduct for the elevated corridor would be wider than the busy stretches of north Chennai and its construction may cut into the frontage of houses and shops.

  
801 views
Nov 09 2016 (06:40)
rdb*^   31881 blog posts   422413 correct pred (82% accurate)
Re# 2053417-1            Tags   Past Edits
nice ,,

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Tue Jan 30
Trains with ARP 15 Dep on: Sun Feb 4
Trains with ARP 30 Dep on: Mon Feb 19
Trains with ARP 120 Dep on: Sun May 20

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.