Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Jan 22, 2018 22:36:07 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Jan 22, 2018 22:36:07 IST

Blog Entry# 2054084
Posted: Nov 09 2016 (19:29)

1 Responses
Last Response: Nov 09 2016 (19:29)
  
Rail News
0 Followers
793 views
Other News
Nov 09 2016 (17:04)   Mumbai: Railways paves way for Rs 103 cr Andheri-Goregaon line, literally - News

Jayashree   38690 news posts
Entry# 2054084   News Entry# 285241         Tags   Past Edits
You can expect work on the Rs 103 crore Andheri-Goregaon Harbour line to start soon. Authorities have demolished the illegal bar and another structure near Jogeshwari station because of which the line had remained stuck for over two years. On November 5, officials demolished the structures, removed the rubble, dumped it in trucks and took it away, all under police protection. Two trucks, one JCB machine and police vans were pressed into service for the demolition. Out of the way Officials said the demolished structures — New Rishi Desi Bar and another near it — were next to Jogeshwari station (W) bus depot and adjacent to platform one. There is a level-crossing gate that was shut for vehicular movement and people, but in mid-October it was opened, as there was too much pressure on the foot overbridge (FOB). There had even been a court case going on the illegal edifices with...
more...
the railways saying it needed the land for the proposed extension of the Chhatrapati Shivaji Terminus-Andheri Harbour line till Goregaon, which was supposed to be completed in May 2014. Now, Mumbai Rail Vikas Corporation officials have kept a deadline of March 2017. Presently, Jogeshwari station comes both sides when travelling in Churchgate-bound trains, ie people can alight from both sides of a compartment, either on platform 1 or 2. Sources said the island platform connecting 1 and 2 would be removed and platform 1 would be extended by six metres towards Churchgate-end with a landing connecting it to the existing FOB. This will allow the Harbour line to go from behind platform 1 on the west to the new concourse constructed for Harbour line trains at Jogeshwari, which is towards Borivli. Once this line is ready, trains from Panvel or CST will go all the way up to Goregaon. In the next phase, the line will be extended till Borivli.

  
Nov 09 2016 (19:29)
For Better Managed Indian Railways~   1933 blog posts
Re# 2054084-1            Tags   Past Edits
Great news This step should motivate the other officials who are struggling with illegally occupied IR land.
IR have to start the construction of the line immediately and complete it soon lest the encroacher come back and every thing shall be back to square one.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Feb 1
Trains with ARP 15 Dep on: Tue Feb 6
Trains with ARP 30 Dep on: Wed Feb 21
Trains with ARP 120 Dep on: Tue May 22

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.