Blog Entry# 2055322
Posted: Nov 10 2016 (20:34)

6 Responses
Last Response: Nov 12 2016 (20:53)
  
★★  General Travel
0 Followers
2415 views
Nov 10 2016 (20:34)   GTL/Guntakal Junction (6 PFs)

Vishnu Datta Jacke   105 blog posts
Entry# 2055322            Tags   Past Edits
India's Most Powerful Locomotive hauls passenger : Indian Railway's
57437/8 GTL~HUP~GTL Pass with AJNI WAG9 :)

1 posts - Thu Nov 10, 2016

  
1809 views
Nov 11 2016 (02:46)
HOG WAM4 WAP1~   3224 blog posts
Re# 2055322-2            Tags   Past Edits
Must have just got whichever freight loco was available at GTL. The line capacity may be low now because of the incomplete sub-station works. So only a few trains can run with e-locos, and it will be safer to just let the passengers get it now. Also, the route now heavily depends on GTL and SBC/YPR for e-locos, and both places only have trip sheds and depend on incoming trains for locomotives. Since both places have a well-established LSA's now, it will take some time before both zones can work out the Loco sharing arrangements, and providing additional locomotives to both places and start running trains with regular links.
Mostly the prestigious trains won't get electric
...
more...
locos until further electrification is completed. Raj/Duronto will only get electric traction after GTL-Wadi is electrified, KSK and other trains going via GY will not be electrified until the Dhone-SC route is electrified. First express trains to get e-locos could be the ones reversing in GTL like Prashanti or Prashanti Nilayam.
KK may switch to electric traction between GTL-SBC ( may be not likely), but I hope KK at least sticks to Twin ALCO links until GTL-DD is electrified. Twin ALCO links were one of the most iconic things about the KK, and no plain, washed out WAP7 can match that!

  
1447 views
Nov 12 2016 (01:18)
Foamer~   2091 blog posts
Re# 2055322-4            Tags   Past Edits
If SWR is really serious about cutting down diesel bill and maintaining punctuality, they will surely work out LSA. Many trains can easily have LSA at GTL.
-
As for GY or Dhone - both have crew changing facilities. If they can work out LSA for a few trains it will be good, as the loco may not need maintenance, since its just some 350 odd Kms from SBC, so that works out to 700 Kms between maintenance. They don't need ETS for such short hauls isn't it?.

  
Nov 12 2016 (01:45)
HOG WAM4 WAP1~   3224 blog posts
Re# 2055322-5            Tags   Past Edits
It'll take some time though. In case of routes like MMR-Pune or NDLS-GKP, the e-locos were being provided from NDLS side, and trains just had to proceed further from MMR or GKP with the same e-loco. So they could immediately start switching to e-locos.
But in this case, most of the trains in this route originate at SBC/YPR which have only trip sheds and cannot easily provide more locomotives on demand. There are about 30 odd trains on this route every week, and it'll take time for SCR/SWR to make arrangements to have more locomotives ready at GTL or SBC/YPR. So rest assured, it would take a couple of months on completion of the substation to
...
more...
have trains running with e-locos here.
The bigger problem is the incomplete sub-station. Unlike diesel routes which have practically no capacity constraints, Electrified routes are limited by the sub-station capacity. As the Someshwara substation is still to be completed, not many trains can run with electric traction as of now.
GY has only 2 platforms, that's why SCR doesn't do any loco changes there. Trains like Venkatadri and KCG-MS run with diesel traction between RU-GY . Dhone can surely have loco changes, so trains with scheduled halts will get a loco change there, but trains with only technical halts there like Raj/KSK will continue with diesel locos to save time.
SCR has traditionally preferred running trains with diesel-under-wire until the routes are completely electrified till convenient locations, particularly the twin-diesel hauled trains. So, the trains by-passing GTL and not having a scheduled halt at Dhone might not get e-locos until completion of the route till SC.

  
Nov 12 2016 (16:58)
Vishnu Datta Jacke   105 blog posts
Re# 2055322-6            Tags   Past Edits
Have to wait becoz in YNK~DMM only 17kv Volts giving instead of 25Kv ,
i heard that some problem at Someshwaram Sub-Station.
when it recovers we can see many with with AC Loco's 18463/4 , 17603/4 , 11013/4 , YPR~ADI , CBE~Rajkot, Okha~Tuticorin this all trains going to get e~link only bwt GTL~SBC ;
SBC~NZM Rajdhnai ,
YPR~DEE
...
more...
Duronto ,
YPR~SC Garibrath ,
tht above trains will get End~End E-link
already Links also setted up RPM Shed no worries .

  
1336 views
Nov 12 2016 (20:53)
Foamer~   2091 blog posts
Re# 2055322-7            Tags   Past Edits
Thanks. Any idea when the problem will be resolved and it will achieve 25KV?
-
The problem with current govt is they are inaugurating things half-done. Now first off they are good, in the sense they are trying to complete old projects before announcing new. But why inaugurate before things are completed?
-
I
...
more...
keep going back to Palani-Palakkad line. They did the GC. Good ..... Very Good!!!! But to get full benefit of the credit from people, politically, run atleast one or two passengers thru and thru. Or else, instead of appreciation and votes, people will be angry and the backlash will damage their chances, come 2019.
-
Why inaugurate NDL-YA line before things are in place? People waited for 20 years, they will surely wait another year. Instead now, only the memory of badly finished project and non-utilization of the line will be on top of people's mind.
-------------
Some trains like Nagercoil/TVC-CST, TN-OKHA, CBE-RJT trains will get e-locos before SBC trains because they pass thru ED, so they may get from ED to GTL. This I base on the document shared by PUNE/DD members who before the inauguration shared a doc in which RB had asked zones to run some of these trains with e-locos on electrified section. Also, I recently saw a train (17316) which hitherto was coming with d-loco, came to YPR with e-loco from ED.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Jan 28
Trains with ARP 15 Dep on: Fri Feb 2
Trains with ARP 30 Dep on: Sat Feb 17
Trains with ARP 120 Dep on: Fri May 18

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.