Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Jan 24, 2018 17:31:50 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Jan 24, 2018 17:31:50 IST

Blog Entry# 2057349
Posted: Nov 12 2016 (14:40)

1 Responses
Last Response: Nov 12 2016 (14:40)
  
Rail News
0 Followers
596 views
Other News
Nov 12 2016 (14:23)   Dedicated Freight Corridor To Be Complete By 2019: Indian Railways

Jayashree   38704 news posts
Entry# 2057349   News Entry# 285496         Tags   Past Edits
NEW DELHI:  The Indian Railways today said that the work on the dedicated freight corridor will be completed by the end of 2019, which will result in enhanced profits and punctuality.
"The work on the dedicated freight corridor is on fast track and it is expected to be complete by December 2019," Railway Board Chairman A.K. Mital said while speaking at the Economic Editors' Conference 2016.
"Once the dedicated freight corridor work is complete, it shall prove to be a 'game changer' for the railways."
He
...
more...
told the conference that Ministry of Railways has finalised contracts worth Rs. 35,000 crore for the dedicated freight corridor.
On punctuality enhancement, Mr Mital predicted that By 2020, the punctuality rate will reach 95 per cent. Currently, only 80 per cent of trains in India run on time.
Emphasising the need to increase the speed of the trains, he said: "After launching the Gatimaan Express earlier this year, we are also working to enhance the speed of all Express trains on the Diamond Quadrilateral High Speed Rail Network."
"Feasibility studies of Delhi-Mumbai, Delhi-Kolkata and Mumbai-Chennai are underway."
Currently, the average speed of freight trains in India is about 25 km per hour, while that of average Express train is in the range of 50-55 km per hour.
"After the completion of the work on these tracks the average speed of the Express trains would go up to 75 kmph, with maximum speed of 100 kmph, while the average speed of the goods train would improve to 50 kmph," the Railway Board Chairman said.
Mr Mital elaborated that the railways, which spends about Rs. 30,000 crore per year on its energy requirements, will try and bring this cost down by 10 per cent.
"Every year, we spend Rs. 30,000 crore on energy expenses, and now we are trying to make savings on the energy bill, we are targetting to reduce the energy bill by 10 per cent currently (not on diesel part but on electricity part)," Mr Mital said.
"We have asked all the states to give us NOCs to procure cheaper power from wherever it is available in the states."
The Indian Railways spends about Rs. 18,000 crore on diesel, and Rs. 12,000 crore on electricity bill.
Emphasising the projects undertaken by the railways in the northeastern states, Mr Mital said: "By the end of this fiscal year (2016-17), all the metre guage tracks will be converted to broad guage in the northeastern states."
"By 2020, we would connect all the northeastern states' capital cities with railways."
He said that railway tracks will become human waste free from 2019 and that unmanned railway crossings will be eliminated in the next four to five years.
Mr Mital pointed out that lack of investment in infrastructure erection had stalled railway's modernisation.
"In the last few decades, we didn't invest much in the railways, due to which the modernisation of infrastructure and upgradation of the railway tracks didn't take place," he said.
"But now there has been a paradigm shift," Mr Mittal said, and added that extra budgetary resources such as loans and bonds have been utilised for infrastructure creation.
On an annual basis, the Indian Railways ferry about 800 crore passengers and three lakh metric tonnes of freight.

  
1361 views
Nov 12 2016 (14:40)
Mazi IRI~   873 blog posts
Re# 2057349-1            Tags   Past Edits
"By 2020, we would connect all the northeastern states' capital cities with railways."
IMPOSSIBLE.
Presently Guwahati, Agartala, Itanagar (Naharlagun) connected.
Aizwal (Sairang) & Imphal ll connect by 2019/2020.
Less possibility of Kohima(Zuzba) by 2020.
...
more...
may be 2023.
Shillong & Gangtok impossible. It ll on 2025.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Feb 3
Trains with ARP 15 Dep on: Thu Feb 8
Trains with ARP 30 Dep on: Fri Feb 23
Trains with ARP 120 Dep on: Thu May 24

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.