Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri Jul 28, 2017 18:30:03 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Jul 28, 2017 18:30:03 IST

Blog Entry# 2068730  
Posted: Nov 23 2016 (12:34)

1 Responses
Last Response: Nov 24 2016 (14:10)
  
General Travel
0 Followers
1039 views
Nov 23 2016 (12:34)   ADB/Adilabad (3 PFs)

Guest: 35e09d06   show all posts
Entry# 2068730            Tags   Past Edits
please start a passenger train from this station adilabad-kazipet junction via majri kadhan-ballarshah-peddapalli-kazipet total distance of 383kms serving 5 north telangana districts adilabad,komaram bheem asifabad,mancherial,peddapalli and warangal districts and it is a very short distance route for adb people to go to warangal and this passenger will cover chandrapur dist head quarter in maharastra and moreover mjkn-adb-mue route dont have any passenger trains whatever all the trains run in this route are express trains so this is the problem why this route has poor patronage without any income and with less traffic and this route dont even have any pushpull demu trains also so fate,and the speed in this route is very low when compared with other routes.
so there should be
...
more...
understanding between two zone railway officials of cr and scr zone in laying this passenger train from adilabad-kazipet jn,so please forward this proposal to railway authorites and local mp's and mla's should ask for this train which would benefit lots of passengers
suppose if in krishna express from adilabad-kazipet it will take lot of time 250+161+132=543kms a long circutious route for adb local people and diesel single line till medchal via mue-nzb-sc and it will take lot of travel time and distance is very high and charge is more and inconvenient for passengers
if you run the train via mjkn-bpq-pdpl it is only 383kms reducing nearly 16okms when compared to that circutious route mue-nzb-sc and moreover two times engine reversals should be done at mudkhed and secunderabad stations, if you run via mjkn-bpq-pdpl there is no need of any loco reversals and train will run with the same diesel engine till kazipet from adilabad.so please think about this,the only problem is the mutual understanding between both zone railway officials from adb-bpq it is cr and from bpq-kzj it is scr that is the only problem,so if these officials can think they can solve this issue and they can lay this train
and moreover this should be a day passenger train starting from adb at 7:00 am
adilabad-kazipet proposed fast passenger via majrikhadhan,ballarshah,peddapalli
adb------ 05:20 return journey details from kazipet-adilabad
mjkn-07:55 07:57 kzj-----------16:05
bpq- 09:10 09:20 jmkt-16:48 16:50
skzr-10:55 10:57 pdpl-17:40 17:42
bpa- 11:43 11:45 rdm- 18:08 18:10
mci- 12:10 12:12 mci--18:30 18:32
rdm-12:30 12:32 bpa-19:06 19:08
pdpl-12:55 12:57 skzr-20:00 20:02
jmkt-13:46 13:48 bpq- 21:55 22:05
kzj-15:05 cd-22:27 22:30
mjkn-23:18 23:20
adb-02:00

  
949 views
Nov 24 2016 (14:10)
San   94 blog posts
Re# 2068730-1            Tags   Past Edits
Completely agree bro...
Also need to have NED-CD passenger as lot of Marathwada people visit Mahankali temple in CD.
Problem is ...this route (PMKT-MJRI) is mainly for for coal & clinker transportation and CR neglecting it for passenger traffic.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Aug 7
Trains with ARP 15 Dep on: Sat Aug 12
Trains with ARP 30 Dep on: Sun Aug 27
Trains with ARP 120 Dep on: Sat Nov 25

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.