Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri Jul 21, 2017 10:17:14 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Jul 21, 2017 10:17:14 IST

Blog Entry# 2076241  
Posted: Nov 30 2016 (20:17)

6 Responses
Last Response: Dec 04 2016 (09:12)
  
General Travel
0 Followers
1970 views
Nov 30 2016 (20:17)   BRKA/Barkakana Junction (5 PFs)

Aditya*^~   4444 blog posts   2416 correct pred (69% accurate)
Entry# 2076241            Tags   Past Edits
please check attached PGPORTAL reply by Railway board for Doubling of Bermo - Barkakana.
so till 2020 suffer.
it is shocking as IR gets good return from this section.

1 posts - Wed Nov 30, 2016

  
1186 views
Nov 30 2016 (20:24)
Aditya*^~   4444 blog posts   2416 correct pred (69% accurate)
Re# 2076241-2            Tags   Past Edits
i think it is typo error, it would be "30", but he typed "39", "0" is just after "9" in keyboard.
till now only 3 km doubling finished, Bermo-jarangdih.
from Ranchi Road to Barkakana is 9km. finishing 9km will take another 3 and half years.

  
1467 views
Nov 30 2016 (20:27)
Marwar Mavli Gauge conversion must start ASAP^~   83595 blog posts   5301 correct pred (78% accurate)
Re# 2076241-3            Tags   Past Edits
will surely get late , ir never follow deadline.. for 50 oddkm #doubling they will take minimum 4 years...

  
1050 views
Nov 30 2016 (20:27)
A capella*^~   9450 blog posts   2470 correct pred (76% accurate)
Re# 2076241-4            Tags   Past Edits
So, do they don't even cross-check what they write ? What a shame! Thanks to the steno that was typing this reply of your PG.

  
1200 views
Nov 30 2016 (20:53)
DhnEcr~   5397 blog posts
Re# 2076241-5            Tags   Past Edits
Tracks completed like Tori LAD nad BRKA-Hazaribagh have still not been commercialized why ??

  
1026 views
Dec 04 2016 (09:12)
Aditya*^~   4444 blog posts   2416 correct pred (69% accurate)
Re# 2076241-6            Tags   Past Edits
news about barkakana - hazaribagh railway line commissioning :
click here

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Jul 31
Trains with ARP 15 Dep on: Sat Aug 5
Trains with ARP 30 Dep on: Sun Aug 20
Trains with ARP 120 Dep on: Sat Nov 18

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.