Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sun Aug 20, 2017 06:08:52 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun Aug 20, 2017 06:08:52 IST

Blog Entry# 2084551  
Posted: Dec 08 2016 (19:19)

1 Responses
Last Response: Dec 08 2016 (19:19)
  
Rail News
0 Followers
294 views
Commentary/Human Interest
Dec 08 2016 (19:19)   Minister of Railways inaugurates Website of National Rail Plan, 2030

rdb*^   131664 news posts
Entry# 2084551   News Entry# 288020         Tags   Past Edits
In a further move to take the Indian Railways at an advanced level, Minister of Railways Shri Suresh Prabhakar Prabhu in a programme held in Rail Bhawan today i.e. 08.12.2016 launched website of National Rail Plan, 2030. The website can be accessed at click here This dedicated website for National Rail Plan (NRP, 2030) has been developed for all stakeholders to give their inputs for purposeful study as Railways’ planning cannot be done in isolation. In order to provide long term perspective to planning for augmenting the railway network Ministry of Railways have decided to develop National Rail Plan (NRP 2030) in consultation with all the stakeholders including State Governments, public representatives and other relevant Central Ministries. NRP-2030 will endeavour to harmonise and integrate the rail network with other modes of transport and create synergy for achieving seamless multi modal transportation network across the country. This will also...
more...
achieve the Hon’ble Prime Minister’s vision of integrated planning and cost optimization of the transportation network by laying the new railway lines and new highways together in tunnels and over mega-bridges.
Speaking on the occasion, Minister of Railways Shri Suresh Prabhakar Prabhu said that Indian Railways needs to form a concrete plan about its doings in the coming 10-20 years. He said that after receiving ideas Railways will capture all the requirements from the different stakeholders. He said that if we have a proper structured demand and decide the time to implement it, it will be very good for the country and the person making the demand. He said that Railways do not want to beat the other modes of transport by competing but want to work by complementing. He said that Railways will be including all the ideas received during recently held Rail Vikas Shivir in the National Rail Plan.

BACKGROUNDER : -

· The Indian Railway Network is a key component of the Country’s Transport System. Transporting goods and passengers on a massive scale, the Indian Railways plays a critical role in India’s economic as well as social fabric, not to mention the security and cross-border strategic linkages. Pragmatic development of Indian Railway Network as part of the country’s overall multi-modal transport system is therefore, very important.

· So far, the development of the network is taken up based on numerous individual requests received from various stakeholders such as State Governments, elected representatives, industries, etc. for sanction of railway projects in different parts of the country. Based upon these representations and based upon infrastructural gaps, operational requirements, bottlenecks strategic requirements, socio-economic considerations and participation by other stakeholders, new railway projects are sanctioned. However, these projects are sanctioned mostly in isolation and may not necessarily take holistic view of railway infrastructural needs of the Country.

· Presently Railway planning is presently not based on some integrated plan. Surveys are initially done as per demands of Public representatives and the some of these lines are later sanctioned. Railways shall reverse the process. First the network plan should be there and accordingly surveys should be started. The network plan shall take into account connectivity to backward region, Congestion in the existing network and futuristic development of Industrial corridors. Deficits in existing network are to be planned for removal. There are huge regional imbalances.

· To take a holistic approach, a beginning was made 2 years back when 24 clusters were identified and process of removal of their bottlenecks was initiated on a corridor basis. Projects were sanctioned to decongest the network and works have started.

· To take this process to next level, National Rail Plan 2030 has been envisaged which shall not only take care of existing corridors but also the identification and development of new corridors & connections. This will facilitate easy movement of freight and passengers, and access to resources and services with reliability, safety and convenience to secure an environmentally efficient and long term sustainable rail transport system.

· Participation of all stake holders is the key in development of NRP. Suggestions/expectations/inputs from all are needed for deliberation and inclusion in NRP. Accordingly dedicated website for National Rail Plan (NRP) 2030 has been developed for all stake holders to give their inputs for purposeful study as Railways planning cannot be done in isolation.
· Railways are open to all ideas including any suggestion regarding how the plan should be prepared and implemented. National Rail Plan web site will be in public domain for consultation and shall be shared with all Stake holders in the transport sector including States, Different ministries involved with transportation, Federations such as CII and FICCI etc. All gaps in railway infrastructure are to be identified and ways to fill them up are to be worked out. There may be surplus infrastructure in some areas whereas deficit in other areas. All gaps are to be identified and balancing of views of all the stake holders in development of plan will be important.

This will also achieve the Hon’ble Prime Minister’s vision of integrated planning and cost optimization of the transportation network by laying the new railway lines and new highways together in tunnels and over mega-bridges.

**********

AKS/MKV/DK

(Release ID :155122)

  
888 views
Dec 08 2016 (19:19)
rdb*^   31707 blog posts   384707 correct pred (81% accurate)
Re# 2084551-1            Tags   Past Edits
National Rail Plan, 2030

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed Aug 30
Trains with ARP 15 Dep on: Mon Sep 4
Trains with ARP 30 Dep on: Tue Sep 19
Trains with ARP 120 Dep on: Mon Dec 18

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.