Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Jul 26, 2017 06:24:12 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Jul 26, 2017 06:24:12 IST

Blog Entry# 2092819  
Posted: Dec 16 2016 (13:55)

1 Responses
Last Response: Dec 16 2016 (13:55)
  
Rail News
0 Followers
466 views
Other News
Dec 16 2016 (12:46)   Lonavla, Daund suburban trains fail to keep time

Jayashree   37009 news posts
Entry# 2092819   News Entry# 288815         Tags   Past Edits
PUNE: Late running of suburban trains in the Daund and Lonavla sections has left thousands of daily passengers frustrated.
"It is a common problem here. The administration is not at all serious about resolving it. There has been no improvement even after repeated complaints to the authorities here," Ajay Jagtap, who often travels to Daund by a passenger train, said while ruing about the extra time he has to spend on travelling due to the late running of these trains.
Sonali Satav, who travels by local trains up to Dehu Road, said the
...
more...
administration should avoid delays at least during the rush hours. "We have often noticed that the local trains are stopped at Chinchwad or Khadki stations to make way for the fast ones. Why can't the administration provide a separate track for suburban trains. Apathy and neglect of suburban traffic is affecting people," she said.
Last week, about 100 angry passengers travelling by Baramati-Pune passenger train took to the rail track and stopped the Coimbatore-Mumbai express after their train was halted to make way for the latter. The issue was resolved only after the local police intervened.
Swapneel Tagare, a college student and resident of Urali, said the administration always gives priority to long distance and goods trains. "Just like Mumbai, there is an urgent need to provide dedicated railway tracks for suburban trains too," he said.
The Pune railway authorities operate local trains up to Lonavla and passenger trains/shuttles up to Daund-Baramati. The proposal for laying of third line up to Lonavla has been sanctioned, however, officials in the rail administration said the line will not start anytime soon as the proposal is yet to go through many stages.
Meanwhile, railway administration has maintained that they were not ignoring suburban passenger traffic.
A senior official from the administration said, "We are aware of the late running of trains on some occasions and the administration is taking steps to check this."
He, however, claimed that the mail/express trains are running with 90% punctuality. "Even the suburban ones are 70%-80% on time," he said, adding that the administration does not deliberately operates the suburban trains late.
Stay updated on the go with Times of India News App. Click here to download it for your device.

  
1155 views
Dec 16 2016 (13:55)
For Better Managed Indian Railways~   1933 blog posts
Re# 2092819-1            Tags   Past Edits
Express trains, Passenger trains, Freight trains and Suburban trains all on the same track is a perfect recipe for poor train services. Suburban train travellers complain about regular delay and also long distance paxs too complain when the premium trains crawl on the suburban sections where they share track with much slower suburban trains. No body is happy.
Although, the Suburban trains carry the lowest class of passengers (least paying) but demand very high priority as it is a daily travel and paxs can ill afford to lose even 15 minutes every day where as an AC first class traveller of Rajdhani Express does not mind a delay of 15 minutes, as it is just a one time affair for him/her.
...
more...

Best option is to have dedicated tracks for suburban trains so that quality and punctuality of all kinds of could be maintained. In the Pune-Daund case at least 3rd track must be constructed as the quantum of passengers may not be enough to justify a dedicated suburban corridor.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Aug 5
Trains with ARP 15 Dep on: Thu Aug 10
Trains with ARP 30 Dep on: Fri Aug 25
Trains with ARP 120 Dep on: Thu Nov 23

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.