Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Aug 24, 2017 16:49:26 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Aug 24, 2017 16:49:26 IST

Blog Entry# 2096574  
Posted: Dec 19 2016 (18:37)

8 Responses
Last Response: Dec 20 2016 (15:15)
  
Rail News
0 Followers
2518 views
New Facilities/TechnologyNER/North Eastern  -  
Dec 19 2016 (10:25)   पूवरेत्तर रेलवे की लूप लाइनों का भी होगा विद्युतीकरण

☆गोंडा इलेक्ट्रिक शेङ ■☆*^~   6438 news posts
Entry# 2096574   News Entry# 289061         Tags   Past Edits
इन रेलखंडों का होगा विद्युतीकरण 13गोरखपुर कैंट-कप्तानगंज-बाल्मीकि नगर 96 किमी। 3आनंदनगर-गोंडा-बहराइच-मैलानी 443 किमी। 3भटनी-बेल्थरा-औड़िहार 125 किमी। 3कप्तानगंज-थावे-खैरा-छपरा कचहरी 206 किमी। 3कल्याण-कासगंज-मथुरा 338 किमी। 3औड़िहार-जौनपुर 60 किमी। 13
जागरण संवाददाता, गोरखपुर : आखिरकार, इंतजार की घड़ियां समाप्त हो गईं। गोरखपुर में वातानुकूलित इलेक्टिक लोको शेड के शिलान्यास के बाद पूवरेत्तर रेलवे के लूप लाइनों पर भी विद्युतीकरण की आस जग गई। मंत्रलय ने रेल बजट में ही 1035 किमी रेल खंड के विद्युतीकरण की स्वीकृति प्रदान कर दी थी। इसके लिए 1424.59 करोड़ रुपये का बजट भी स्वीकृत हो चुका है। 1पूवरेत्तर रेलवे के मुख्यमार्ग बाराबंकी- छपरा (424 किमी) रेल खंड का विद्युतीकरण तो पहले ही पूरा हो चुका है। गाड़ियां इलेक्टिक इंजन से फर्राटा भर रही हैं। सीवान-थावे रूट पर कार्य चल
...
more...
रहा है। रेलमंत्री ने बांद्रा टर्मिनस से अंतिम चरण में पूरा हुआ गोरखपुर- गोंडा विद्युतीकरण का भी लोकार्पण किया। फिलहाल, लोको शेड के निर्माण के लिए रेल मंत्रलय ने 89.34 करोड़ रुपये अवमुक्त कर दिया है। एयरफोर्स परिसर के समीप बनने वाले लोको शेड के लिए सड़क आदि का निर्माण कार्य शुरू हो चुका है। इस शेड में इलेक्टिक इंजनों का रखरखाव और मरम्मत आदि कार्य होगा। यहां से निकले इंजन गोरखपुर के नाम से जाने जाएंगे। आने वाले दिनों में 12555/12556 गोरखधाम सुपरफास्ट एक्सप्रेस सहित पूवरेत्तर रेलवे की सभी गाड़ियां इलेक्टिक इंजन से ही चलाई जाएंगी। 1गोरखपुर में दूसरी व तीसरी लाइन भी: रेल मंत्रलय ने पूवरेत्तर रेलवे के मुख्यालय स्टेशन गोरखपुर जंक्शन पर गाड़ियों का दबाव कम करने के लिए डोमिनगढ़-गोरखपुर-कैंट-कुसम्ही के बीच तीसरी रेल लाइन बिछाने तथा गोरखपुर-नकहा जंगल रेल लाइन के बीच दोहरीकरण के लिए 186.9 करोड़ रुपये स्वीकृत किया है। अतिरिक्त रेल लाइन के बिछ जाने से अधिकतर मालगाड़ियां गोरखपुर में बिना रुके ही पास कर जाएंगी। दूर से चलकर आने वाली यात्री गाड़ियां भी समय से प्लेटफार्म पर लग जाएंगी। अक्सर, लोड बढ़ने पर लंबी दूरी की गाड़ियां भी पास वाले स्टेशन या आउटर पर घंटों खड़ी रह जाती हैं। यात्री परेशान होते हैं।जागरण संवाददाता, गोरखपुर : आखिरकार, इंतजार की घड़ियां समाप्त हो गईं। गोरखपुर में वातानुकूलित इलेक्टिक लोको शेड के शिलान्यास के बाद पूवरेत्तर रेलवे के लूप लाइनों पर भी विद्युतीकरण की आस जग गई। मंत्रलय ने रेल बजट में ही 1035 किमी रेल खंड के विद्युतीकरण की स्वीकृति प्रदान कर दी थी। इसके लिए 1424.59 करोड़ रुपये का बजट भी स्वीकृत हो चुका है। 1पूवरेत्तर रेलवे के मुख्यमार्ग बाराबंकी- छपरा (424 किमी) रेल खंड का विद्युतीकरण तो पहले ही पूरा हो चुका है। गाड़ियां इलेक्टिक इंजन से फर्राटा भर रही हैं। सीवान-थावे रूट पर कार्य चल रहा है। रेलमंत्री ने बांद्रा टर्मिनस से अंतिम चरण में पूरा हुआ गोरखपुर- गोंडा विद्युतीकरण का भी लोकार्पण किया। फिलहाल, लोको शेड के निर्माण के लिए रेल मंत्रलय ने 89.34 करोड़ रुपये अवमुक्त कर दिया है। एयरफोर्स परिसर के समीप बनने वाले लोको शेड के लिए सड़क आदि का निर्माण कार्य शुरू हो चुका है। इस शेड में इलेक्टिक इंजनों का रखरखाव और मरम्मत आदि कार्य होगा। यहां से निकले इंजन गोरखपुर के नाम से जाने जाएंगे। आने वाले दिनों में 12555/12556 गोरखधाम सुपरफास्ट एक्सप्रेस सहित पूवरेत्तर रेलवे की सभी गाड़ियां इलेक्टिक इंजन से ही चलाई जाएंगी। 1गोरखपुर में दूसरी व तीसरी लाइन भी: रेल मंत्रलय ने पूवरेत्तर रेलवे के मुख्यालय स्टेशन गोरखपुर जंक्शन पर गाड़ियों का दबाव कम करने के लिए डोमिनगढ़-गोरखपुर-कैंट-कुसम्ही के बीच तीसरी रेल लाइन बिछाने तथा गोरखपुर-नकहा जंगल रेल लाइन के बीच दोहरीकरण के लिए 186.9 करोड़ रुपये स्वीकृत किया है। अतिरिक्त रेल लाइन के बिछ जाने से अधिकतर मालगाड़ियां गोरखपुर में बिना रुके ही पास कर जाएंगी। दूर से चलकर आने वाली यात्री गाड़ियां भी समय से प्लेटफार्म पर लग जाएंगी। अक्सर, लोड बढ़ने पर लंबी दूरी की गाड़ियां भी पास वाले स्टेशन या आउटर पर घंटों खड़ी रह जाती हैं। यात्री परेशान होते हैं।

3 posts - Mon Dec 19, 2016

  
1947 views
Dec 19 2016 (18:47)
The Aviator~   94 blog posts
Re# 2096574-4            Tags   Past Edits
This.
Railway koi ehsaan nahi kar raha.. Ye sab pehle hi mil jaana tha... Iss section ko railway ne kaafi time se ignore kiya.. Ab bharpaai to banti h boss!

  
1961 views
Dec 19 2016 (18:49)
☆गोंडा इलेक्ट्रिक शेङ ■☆*^~   14680 blog posts   3073 correct pred (65% accurate)
Re# 2096574-5            Tags   Past Edits
Maine kab kaha Ehsaan krrha lagta hai tumne mera nearest station nhi dekha tabhi aisa likh rhe ho haha

  
1938 views
Dec 19 2016 (18:51)
The Aviator~   94 blog posts
Re# 2096574-6            Tags   Past Edits
Hahahaha.. I am with you on this.
What I meant to say is that you are right in stating that we are getting our dues...

  
1301 views
Dec 19 2016 (19:32)
GKP LKO Section 120kmph Sucessful Trail Done~   3937 blog posts   6 correct pred (100% accurate)
Re# 2096574-7            Tags   Past Edits
Means iske baad freight train Gkp skip karegi😂😂

  
9029 views
Dec 20 2016 (15:15)
Railfan Rishi   1465 blog posts   24 correct pred (54% accurate)
Re# 2096574-8            Tags   Past Edits
IZN-KGM And RMU-KGM ko vahin chod do boss. Fayda nahi hain electrification karke. jab Passenger traffic bade ga tabhi hoga. Aur NER me bhi vahin par Electrification hoga jahan Pax raffic jyada hain. haan , Tracks aur sleeper change kar sakte hai.. bahot hi kharab halat hai tracks ki in RMU-KGM route Poorly jointed tracks hai . Purana bhi hai. . Rlys should make use of the land at Haldwani Rly station . Platforms or a coach care centre should be made so that more trains can come to KGM. 6 km distance (KGM-HDW) cover karna , majak ban gaya hai . Shatabdi bhi pit rahi hai. Agar aap dekho to kam se kam ek pit line banne layak space hai Haldwani me. Kathgodam ko to aur ched nahi sakte. Poora Conjested ho gaya hai !
Vaise
...
more...
Sab election ke chakkar me ho raha . Ye har time hota hai election me. In each and every state of India. Prabhu Sir looks more reliable than other RMs. I dont know whether NER had proposed the Infrastructure development . If they had , why did the Railway Ministry Put down those proposals in the past .Blame also goes to RM at the Time when UPA 2 was at the Centre.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Sep 3
Trains with ARP 15 Dep on: Fri Sep 8
Trains with ARP 30 Dep on: Sat Sep 23
Trains with ARP 120 Dep on: Fri Dec 22

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
  • Entry# 2136570
    Jan 23 2017 (12:25AM)


    Several new features have been introduced recently to the Forum, and we are forever striving to make Member experience here more productive and satisfying. With the recent introduction and success of the new FM System, it has been observed that small groups of highly involved and enthusiastic members are far more...
  • Entry# 2134907
    Jan 21 2017 (02:46PM)


    It has been over 2 weeks since the appointment of the current batch of FMs and 750 Complaints have been handled so far. It gives me immense pleasure in congratulating them for running the team diligently, professionally, competently and above all, without a shred of controversy or bias. The FM position...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.