Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Jan 17, 2018 21:30:43 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Jan 17, 2018 21:30:43 IST

Blog Entry# 2097740
Posted: Dec 20 2016 (19:46)

1 Responses
Last Response: Dec 20 2016 (19:46)
  
Rail News
0 Followers
411 views
Other News
Dec 20 2016 (19:06)   Nagpur metro performs bhoomipujan of a depot coming up at MIHAN - Nagpur Today : Nagpur News

Jayashree   38658 news posts
Entry# 2097740   News Entry# 289204         Tags   Past Edits
‘Bhoomipujan” for the Construction of Rolling Stock depot at MIHAN for N-S Corridor was performed today on the premises of the MIHAN depot. The ‘Bhoomipujan’ was performed at the hands of Brijesh Dixit, Managing Director – Nagpur Metro Rail Corporation Ltd, in the distinguished presence of Sunil Mathur Director (Rolling Stock & Systems), Janak Kumar Garg- CPM(Rolling Stock) and M. Zazou, Project Director,General Consultant and representatives of depot contractor.
This depot will primarily serve the maintenance requirements of Rolling Stock of N-S Corridor (Automative square to Khapri). NMRCL has adopted an innovative approach for cost reduction. The maintenance depot shed will be reduced to half. Since the trains will be maintained in the depot a week, the stabling lines will also be
...
more...
reduced to one third. Only trains that require maintenance will be stabled at the depot and all the remaining trains will be stabled at the terminals. The overall track length will be reduced as well as the length of Inspection Bay Line will also be reduced. In addition to rolling stock maintenance; MIHAN Depot will have maintenance facilities for Track, OHE, Power supply, Signalling and Telecom.
The unique feature of this depot is optimisation of available land for depot construction and property development. This depot is smallest in terms of land requirement. Total Area of land for this depot is 76.5acres out of which 21.5 acres will be used in Phase I. 11 rakes will be maintained in this depot in phase I and the depot will have future capacity of expansion for 11 more rakes. The roofs of the Depot building and boundary wall will have Solar Panelling.
State of the art Machinery & Plant are being procured for this depot. The Depot will have an Automatic train Wash Plant of 60 x 7.7m and one Internal Cleaning Plant of 80 x 7.2m.
The proposed work of construction of the depot in MIHAN is scheduled to be completed in 80 weeks. The work is awarded to the Joint Venture of M/S Pratibha, M/s Capacite Structures Ltd and M/s Sudhir Constructions at a contract value of 275crores. The JV has mobilized machinery and manpower to begin the work immediately.

  
1434 views
Dec 20 2016 (19:46)
Guest: 346f5f9c   show all posts
Re# 2097740-1            Tags   Past Edits
Mythological King

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Jan 27
Trains with ARP 15 Dep on: Thu Feb 1
Trains with ARP 30 Dep on: Fri Feb 16
Trains with ARP 120 Dep on: Thu May 17

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.