Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sat Nov 25, 2017 03:47:21 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sat Nov 25, 2017 03:47:21 IST

Blog Entry# 2180307
Posted: Feb 27 2017 (19:43)

2 Responses
Last Response: Mar 01 2017 (21:06)
  
01
Station Tip
General
0 Followers
3438 views
Feb 27 2017 (19:43)   NZB/Nizamabad Junction (3 PFs)

Guest: 71069caa   show all posts
Entry# 2180307            Tags   Past Edits
I think SCR may divert the special trains like Nanded-Tirupati-Nanded,Nagarsol-Tirupati-Nagarsol after sanctioning the new Railway Line Peddapalli-Nizamabad,Let us see what will happen.
As some of the people said there are 99% chances of Re-routing Shirdi-Visakhapatnam-Shirdi 18503/04 Via this new Route and Tirupati-Shirdi-Tirupati 17417/18 also.
As of now from Chennai-Mumbai there are daily 3 trains via Arakkonam-Renigunta-Kadapa-Gooty-Guntakal-Raichur- Wadi-Solapur-Kuruduvadi-Daund-Pune-Kalyan.
From Chennai-Mumbai the three daily
...
more...
trains are as Follows:-
I)12164/63 Chennai Egmore-Dadar-Chennai Egmore Superfast Express Daily (Via AJJ-RU-HX-GY-GTL-RC-WADI-SUR-KWV-DD-PUNE-KYN)
II)11042/41 Chennai-Mumbai CST-Chennai Express (Via AJJ-RU-HX-GY-GTL-RC-WADI-SUR-KWV-DD-PUNE-KYN)
III)11028/27 Chennai-Mumbai CST-Chennai Mail(Via AJJ-RU-HX-GY-GTL-RC-WADI-SUR-KWV-DD-PUNE-KYN)
From Chennai Central/Egmore-Guduru-Vijayawada Section People don't have direct train to Mumbai at all.If suppose Sullurupeta,Nayudupeta people they want to goto Mumbai they will catch the train at Chennai,If suppose Guduru,Nellore,Kavali People they want to goto Mumbai they will catch the train either at Renigunta or Kadapa,If suppose Ongole,Chirala,Bapatla,Tenali People want to go to Mumbai they will catch the train at Vijayawada Jn.
And Moreover from Kazipet-Peddapalli section people also dont have nearest train route to Mumbai,Even There are 2 weekly trains running in Kzj-Pdpl section like 22127/28 Aanandwan Express,11083/84 Tadoba Express,Both of these weekly trains are taking a long route.
My suggestion is that to the Railway Authorities to divert any of the above following trains from Chennai-Mumbai Via Guduru-Vijayawada-Warangal-Peddapalli-Karimnagar-N izamabad-Nanded-Parbhani-Aurangabad-Nagarsol-Manma d-Nasik Road-Kalyan which will provide a direct link for Sullurupeta,Guduru,Nellore,kavali,Singarayakonda,O ngole,Chirala,Bapatla,Nidubrolu,Tenali people to have connection with Mumbai City and for Manmad,Nagarsol,Aurangabad,Parbhani,Nanded,Basara, Nizamabad People to have direct Connectivity link to Chennai and ViceVersa.
My choice is to divert 11042/41 Chennai-Mumbai CST-Chennai Express Daily Via(GDR-BZA-WL-PDPL-NZB-NED-PBN-AWB-NSL-MMR-NK-KYN ) which will provide better connectivity for MAS-GDR-BZA people to go to Mumbai as well as for KZJ-PDPL section people also And at the same time for KYN-MMR-AWB-PBN-NED-NZB section people to go to Chennai.
And Moreover From Chennai-Guduru-Tenali-Vijayawada-Warangal-Peddapal li it is a GT Route Fully Double Track and Electrified Route and Right now this Line is going to become a Triple Line From MAS-GDR-BZA tripling is confirmed and From BZA-KZJ-PDPL Tripling is confirmed,so There won't be any problem even if it is Re-routed but additionally this train will travel for 200kms extra Instead it will provide better connectivity for Intermediate stations people to go to Chennai and Mumbai
All of you whoever on this site please put proposal for Re-routing 11042/41 Chennai-Mumbai CST-Chennai Express Daily Via Peddapalli-Nizamabad New Railway Line,Hope It will be Re-routed if somebody puts pressure.
But the drawback is that this train will be travelling for more 200kms if it is Re-routed,But there will be no problem even if it is travelling for 200kms,Instead it will provide a direct Connectivity for the people of MAS-GDR-BZA section people to go to Mumbai and for NZB and MMR people to go to Chennai.Let us Hope For the Best.
Thanking you

  
2816 views
Feb 28 2017 (03:06)
HOG WAM4 WAP1~   2934 blog posts
Re# 2180307-1            Tags   Past Edits
A very useful proposal. The MAS-GDR-BZA route definitely needs connectivity to the western part.
However, with the lack of proper train connectivity between Mumbai and Chennai, diversion of one of the only three daily trains between the 2 cities may not be accepted by the respective zones and that too through a route that is longer by almost 320 km ( The route via PDPL-NZB-MMR is 1599 km, compared to the present route that is 1262km long). Requesting for the diversion of a weekly train might be an easier thing to achieve.
...
more...
Also, some members posted here that LTT-NZB may also be extended up to Karimnagar. In that case, we can request for extension of this train up to GDR and a possible frequency upgrade to bi-weekly. Some adjustments will have to be made due to it's RSA with other trains, but it will be something more easy to implement than a diversion of a Chennai bound train.

  
2618 views
Mar 01 2017 (21:06)
RAICHUR the city for BUSINESS رائچورشہر تجارت کے ل   602 blog posts
Re# 2180307-2            Tags   Past Edits
It will be completely different route, request for new train. you know every day it will full, if you are booking 8-days before.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Tue Dec 5
Trains with ARP 15 Dep on: Sun Dec 10
Trains with ARP 30 Dep on: Mon Dec 25
Trains with ARP 120 Dep on: Sun Mar 25

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.