There is a need of temporary solution as of now and at the same time maintain a train's intermediate stations. After, a permanent solution is available, everything will be restored back to normal. The bypass has to be constructed to avoid GMO LR.
But, I do not see returning of trains on ADRA-GMO section because there is no solution proposed and all trains will be diverted via BKSC or ASN which will be better.