Blog Entry# 2252182
Posted: Apr 27 2017 (03:15)
12 Responses
Last Response: Apr 30 2017 (03:38)
Brahmaputra mail arrived GHY at 1245 hrs and departed at 1302 hrs by SGUJ WDG 4D 70647 on 26.04.17
That third line is constructed between barh and bakhtiyarpur for coal linkage to Ntpc barh.