Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Oct 17, 2017 13:36:09 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Oct 17, 2017 13:36:09 IST

Blog Entry# 2315839
Posted: Jun 11 2017 (09:41)

4 Responses
Last Response: Jun 12 2017 (15:46)
  
General Travel
0 Followers
1586 views
Jun 11 2017 (09:41)  

karim1237890   77 blog posts
Entry# 2315839            Tags   Past Edits
Good news Railways have decided to run with eloco engine to all express trains in Guntakal to wadi section from July 1st 2017.Right now Rayalseema express is running with eloco end to end.From July 1st Rajdhani,Garib rath exp.svdk express,shirdi exp,kolhapur exp,etc recently dmm-sbc-gtl trains running with eloco so now all trains SBC to secunderabad via Gtl getting elocos end to end.Guntakal division officers sent drivers for eloco pilot training .Source:Eenadu.net

  
1260 views
Jun 11 2017 (19:36)
SCR Godavari Express~   2676 blog posts   12 correct pred (94% accurate)
Re# 2315839-1            Tags   Past Edits
Trains running via Gooty only get elocos..but not the trains via GPU.. Garibrath will not eloco... Rajdhani will get eloco and will be diverted via Gooty for 4 or 5 months...

  
569 views
Jun 11 2017 (19:43)
I am the One who KNOCKS~   798 blog posts
Re# 2315839-2            Tags   Past Edits
So no chance of Hampi, Basava, SUR SF, Jodhpur trains getting diverted via GY and being hauled by E-Loco?

  
1244 views
Jun 11 2017 (21:09)
karim1237890   77 blog posts
Re# 2315839-3            Tags   Past Edits
towards secunderabad all express trains including Rajdhani,Duranto,Svdk exp will get eloco from Gtl via Wadi.Electric poles have reached Guntakal only wiring is remaining in this section of guntakal-kalluru.will take 3 or 5 months.

  
503 views
Jun 12 2017 (15:46)
SCR Godavari Express~   2676 blog posts   12 correct pred (94% accurate)
Re# 2315839-4            Tags   Past Edits
Yes .. no chance for these trains to get eloco.. till GTL-Kalluru gets electrified which takes 4 or 5 months..

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Fri Oct 27
Trains with ARP 15 Dep on: Wed Nov 1
Trains with ARP 30 Dep on: Thu Nov 16
Trains with ARP 120 Dep on: Wed Feb 14

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Yesterday (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment" have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are an integral...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.