Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Dec 12, 2017 11:56:38 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Dec 12, 2017 11:56:38 IST

Blog Entry# 2318941
Posted: Jun 13 2017 (19:46)

15 Responses
Last Response: Jun 13 2017 (22:09)
  
General Travel
1 Followers
2437 views
Jun 13 2017 (19:46)   DHN/Dhanbad Junction (8 PFs)

SRC P7s~   994 blog posts
Entry# 2318941            Tags   Past Edits
REVISED TIMINGS OF TRAINS DIVERTED DUE TO CLOSURE OF TRAFFIC ON DHANBAD-CHANDRAPURA SECTION
Due to Jharia Coal Field Fire and acting on subsequent advisory received from Ministry of Coal, Ministry of Railways has decided to stop the operation of Goods and Passenger Traffic on Dhanbad-Chandrapura Railway Line w.e.f. 15th June, 2017. Keeping in view the safety of passengers, Ministry of Railways has diverted 6 pairs of Mail/Express trains over South Eastern Railway system.
Revised Timings of Diverted Trains with Stoppages and change in timings of other trains consequent upon the diversion are
...
more...
given below:
12019/12020 Howrah - Ranchi-Shatabdi Express
(Diverted via Dhanbad- Gomoh- Chandrapura)
12019 STATIONS 12020
06.05 d. Howrah a 21.30
07.48/07.50 a/d Durgapur a/d 19.14/19.16
08.05/08.06 a/d Raniganj a/d 18.56/18.58
08.22/08.24 a/d Asansol a/d 18.40/18.42
09.21/09.26 a/d Dhanbad a/d 17.48/17.53
09.52/10.20 a/d NSCB Gomoh a/d 16.57/17.22
10.38/10.40 a/d Chandrapura a/d 16.35/16.37
11.05/11.07 a/d Bokaro a/d 16.00/16.05
11.56/11.58 a/d Muri a/d 14.53/14.55
13.15 a Ranchi d. 13.45
18619/18620 Ranchi-Dumka Express
(Diverted via Chittaranjan- Asansol - Joychandipahar- Bhojudih- Talgoria- Bokaro)
18619 STATIONS 18620
21.25 d. Ranchi a 04.30
22.34/22.36 a/d Muri a/d 03.05/03.10
22.56/22.58 a/d Jhalda a/d 02.45/02.47
23.35/23.40 a/d Bokaro a/d 02.05/02.10
00.58/01.00 a/d Bhojudih a/d 00.34/00.36
01.38/01.40 a/d Joychandi Pahar a/d 00.01/00.03
02.30/03.00 a/d Asansol a/d 23.00/23.20
03.23/03.25 a/d Chittaranjan a/d 22.02/22.04
NB: No change in timings between Chittaranjan – Dumka – Chittaranjan
of 18619/18620 Ranchi-Dumka Express
.
Consequent on the above, timings of 15905 Kanniyakumai- Dibrugarh Exp. will be changed as under:-
15905
Adra a/d 22.15/22.30
Asansol a/d. 23.40/23.45
18622/18621 Hatia- Patna Express
(Diverted via Chittaranjan- Asansol - Joychandipahar- Bhojudih- Talgoria- Bokaro)
18622 STATIONS 18621
22.00 d. Hatia a 05.45
22.15/22.25 a/d Ranchi a/d 05.20/05.30
22.33/22.35 a/d Namkom a/d 05.00/05.02
23.35/23.40 a/d Muri a/d 03.46/03.51
00.01/00.03 a/d Jhalda a/d 03.20/03.22
00.40/00.50 a/d Bokaro a/d 02.35/02.45
01.55/01.57 a/d Bhojudih a/d 01.03/01.05
02.40/02.42 a/d Joychandi Pahar a/d 00.30/00.32
04.10/04.30 a/d Asansol a/d 23.30/23.50
05.12/05.15 a/d Chittaranjan a/d 22.27/22.29
NB: No change in timings between Chittaranjan – Patna – Chittaranjan
of 18622/18621 Hatia Patna Express
Consequent on the above, timings of 13287 Durg – Patna South Bihar Exp. will be changed as under:-
13287
Asansol a/d. 00.13/00.33
Chittaranjan a/d 00.56/00.58
Jamtara a/d 01.12/01.14
Madhupur a/d 01.44/01.48
NB: No change in timings between Durg – Asansol and Madhupur –Patna
of 13287 Durg – Patna South Bihar Exp.
13304/13303 Ranchi-Dhanbad Express
(Diverted via Chittaranjan- Asansol -Joychandipahar- Bhojudih- Talgoria- Bokaro)
13304 STATIONS 13303
16.05 d Ranchi a 11.50
17.15/17.20 a/d Muri a/d 10.25/10.30
17.40/17.42 a/d Jhalda a/d 10.05/10.07
18.18/18.23 a/d Bokaro a/d 09.25/09.30
19.45/19.47 a/d Bhojudih a/d 08.01/08.03
20.25/20.27 a/d Joychandi Pahar a/d 07.15/07.17
21.20/21.40 a/d Asansol a/d 06.15/06.35
23.05 a Dhanbad d 05.10
13351/13352 Dhanbad-Alappuzha Express
(Diverted via Dhanbad- Gomoh- Chandrapura)
13351 STATIONS 13352
10.30 d. Dhanbad a 13.30
11.00/11.20 a/d NSCB Gomoh a/d 12.25/12.45
11.52/11.54 a/d Chandrapura a/d 11.54/11.56
NB: No change between Chandrapura – Alappuzha – Chandrapura.
15028/15027Gorakhpur-Hatia Maurya Express
(Diverted via Dhanbad- Gomoh- Chandrapura)
15028 STATIONS 15027
02.35/02.50 a/d. Dhanbad a/d 21.55/22.10
03.15/03.55 a/d NSCB Gomoh a/d 20.48/21.08
04.30/04.32 a/d Chandrapura a/d 20.24/20.26
NB: No change in timing between Gorakhpur-Dhanbad-Gorakhpur and Chandrapura – Hatia – Chandrapura of 15028/15027Gorakhpur-Hatia Maurya Express

10 posts - Tue Jun 13, 2017

  
1510 views
Jun 13 2017 (20:41)
Sectumsempra   256 blog posts   1 correct pred (100% accurate)
Re# 2318941-11            Tags   Past Edits
12019/20 has a very fragile TT now, TAT at RNC is only 0.5 hours, any delay on the Up train would be well reflected in the Down train...
Crew change will now take place at Gomoh but Dhanbad has still managed to keep a 5 min halt :)

  
2008 views
Jun 13 2017 (21:32)
मैं हूँ गाँधी का बाप~   9688 blog posts   119 correct pred (71% accurate)
Re# 2318941-12            Tags   Past Edits
Lshatabdi jaisa train ka stoppage 27 min & 28 min...Bhagwan Malik hai

  
2018 views
Jun 13 2017 (21:33)
मैं हूँ गाँधी का बाप~   9688 blog posts   119 correct pred (71% accurate)
Re# 2318941-13            Tags   Past Edits
Isko Gomoh me QLR karwana chahiye with twin loco wap7 & wam4

  
2049 views
Jun 13 2017 (21:39)
DhnEcr~   6048 blog posts
Re# 2318941-14            Tags   Past Edits
Will 13303,04 be non stop b/w Dhn-Asn. Being an express intercity should stop in between given 12340 Coalfield does.

  
2002 views
Jun 13 2017 (22:09)
Sectumsempra   256 blog posts   1 correct pred (100% accurate)
Re# 2318941-16            Tags   Past Edits
Not needed, it would further troll the already trolled Coalfield, look at the runs of Coalfiled for the past 4 months. Look how ER is trolling CF for the last 4 months, you want to give them another excuse for it?
And secondly even an ASN commercial halt is not yet decided. Remember this is a diverted route and say if intermittent halts are provided at KMME, BRR then restoration on the new DHN-CRP line would be difficult!

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Fri Dec 22
Trains with ARP 15 Dep on: Wed Dec 27
Trains with ARP 30 Dep on: Thu Jan 11
Trains with ARP 120 Dep on: Wed Apr 11

  
  

Rail News

  • इंजन फेल होने से परिचालन बाधित  News Entry# 324445
    by: Aaditya^~  Today (11:41)


    जागरण संवाददाता,ओबरा (सोनभद्र) : चोपन-सिंगरौली रेलखंड पर रविवार की सुबह मालगाड़ी का इंजन फेल हो जाने की वजह से घंटों रेलखंड पर ट्रेनों का आवागमन प्रभावित हुआ। इंजन की खराबी की वजह से आधा दर्जन यात्री गाड़ियों सहित कई मालगाड़ियां घंटों लेट हुईं। सूचना पर तत्काल सक्रिय हुए रेल विभाग ने...
  • ट्रेन लेट होने पर भड़के यात्री, किया हंगामा  News Entry# 324444
    by: Aaditya^~  Today (11:35)


    जासं, मुजफ्फरपुर : समस्तीपुर रेलमार्ग के नारायणपुर अनंत स्टेशन पर सोमवार को मुजफ्फरपुर आनेवाली सवारी ट्रेन के एक घंटा विलंब होने पर यात्रियों का गुस्सा फूट पड़ा। स्टेशन पर जमकर हंगामा किया और गार्ड केबिन के पास पहुंचकर उलझ गए। हालांकि, कर्मचारियों के ट्रैक मरम्मत होने की सूचना देने पर आक्रोशित...
  • रेलवे के कर्मचारी अब निजी अस्पताल में भी करा सकेंगे इलाज  News Entry# 324443
    by: Aaditya^~  Today (11:28)


    जागरण संवाददाता, लखनऊ : पूवरेत्तर रेलवे कर्मियों के लिए अच्छी खबर है। पीजीआई और केजीएमयू के साथ अब रेल कर्मी निजी अस्पताल में भी इलाज करा सकेंगे। यही नहीं, निजी पैथोलॉजी से भी रेल कर्मचारी अपनी निश्शुल्क अपनी जांचे करा सकेंगे। एनई मजूदर यूनियन के मंडल मंत्री अजय वर्मा ने बताया...
  • मेट्रो स्टेशन पर रेलवे काउंटर खुलने का रास्ता साफ  News Entry# 324442
    by: Aaditya^~  Today (11:26)


    हुसैनगंज पहुंची दूसरी टीबीएम1सचिवालय स्टेशन से हुसैनगंज के बीच दूसरी टनल बनाने का काम भी लखनऊ मेट्रो मंगलवार को पूरी कर लेगा। टनल बोरिंग मशीन (टीबीएम) स्टेशन रोड के पास पहुंच गई है। हालांकि राष्ट्रपति कार्यक्रम के चलते मशीनों को अभी निकाला नहीं जाएगा। मेट्रो अफसरों के मुताबिक 16 दिसंबर से...
  • स्वर्ण शताब्दी के खाने में कॉक्रोच  News Entry# 324441
    by: Aaditya^~  Today (11:25)


    रेलवे की ढिलाई
    जापानी यात्री के कटलेट में निकला कीड़ा , ट्वीट करके मंत्रलय से की शिकायत
    आइबी...

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.