Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Dec 12, 2017 06:31:28 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Dec 12, 2017 06:31:28 IST

Blog Entry# 2321197
Posted: Jun 15 2017 (12:14)

2 Responses
Last Response: Aug 15 2017 (13:06)
  
Rail News
0 Followers
1064 views
New Facilities/TechnologyNR/Northern  -  
Jun 15 2017 (11:53)   World’s highest rail bridge in Jammu 30 metres higher than iconic Eiffel Tower - Northlines

a2z~   92 news posts
Entry# 2321197   News Entry# 305432         Tags   Past Edits
Jammu Tawi, June 12: The world’s highest railway bridge that will soar 359 metres above the bed of river Chenab in Jammu region of J&K state will also be 30 metres higher than the iconic Eiffel Tower in Paris.
The bridge on the Katra-Banihal railway line at village Kauri in Reasi district of Jammu is likely to be completed by June, 2019 as more than 66 per cent work has been finished.
The world’s highest railway bridge that will soar 359 metres above the bed of river Chenab in Jammu will also be
...
more...
30 metres higher than the iconic Eiffel Tower in Paris. The bridge on the Katra-Banihal railway line at village Kauri in Reasi district is likely to be completed by June, 2019 as more than 66 per cent work has been finished. The 1.3-kilometre-long bridge is being constructed at a cost of Rs 1,250 crore, Konkan Railway chief engineer R K Singh said today. He told that more than 1,300 workers and 300 engineers have been working round-the-clock to complete the bridge by 2019. Its construction started in 2004, but the work was stopped in 2008-09 on the aspect of the safety of the rail passengers due to frequent high velocity winds in the area.
The Railways decided to survey the area again and find some alternate site where the bridge could be constructed on Chenab river to avoid 100 kilometres-an-hour high velocity winds but finally it was decided not to change the site as it is the most suited taking into account the high altitude, said deputy chief engineer R R Malik. He said that it was finally decided to stop train operations when the wind velocity rises to 90 kmh with the help of the automatic signalling system and anemometer (instrument to measure the velocity of winds). He claimed that the bridge under construction can withstand winds upto 260 kmh and its lifespan will be 120 years. He said that on the other side of Chenab river, the Railways is constructing three big tunnels of various lengths – T 2 (5.9 kilometres), T 3 (9.369 kilometres) and T 14 (13 kilometres).
AFCONS Construction Company project manager S M Viswamurthy said that it is a joint venture of AFCONS, VSL and Ultra companies. The company has undertaken the construction of the bridge and the laying of rail track from Katra to Banihal in Jammu region is very treacherous and difficult, he said adding that 80 per cent of the railway line will have to pass through tunnels which are under construction. He said the company has bought a crane from Italy at a cost of Rs 20 crore to carry all the construction material to the site of bridge. He said the crane would become a railway property after the completion of the bridge and would remain installed there for maintenance purposes. He said that it is the most challenging work to construct such a high bridge on the Chenab river and he complimented the engineers and workers for their high morale to complete the project by June, 2019.
Viswamurthy said it is the seventh largest arch-shaped bridge in the world as there is no support except on both sides of the river banks and one of the supporting RCC and steel pillar is 133 metres high. The arch is being supported by piers and trusses. Malik said that force technology firm Denmak has made a model study for the construction of bridge while US-based ITASCA company has rendered help in slope stabilisation. IIT Delhi Professor K J Rao is the project consultant and Indian Institute of Science’s Dr T G Seeta Ram has also rendered help in the construction work. The steel work is being supervised by UK-based consultant David Macanjii. He claimed that slope cuttings, transition curves and curves besides all the foundation work have been completed.

  
2079 views
Jun 15 2017 (12:14)
a2z~   2214 blog posts
Re# 2321197-1            Tags   Past Edits
* The 1.3-kilometre-long Chenab bridge (cost- Rs 1,250 crore) is one of the most awaited projects in India.
* A journey over this bridge shall be no less than a fun ride in amusement park. Travelling in a train moving at 100kmph at a height of 359M over the mighty Chenab river flowing down the Majestic Himalaya shall definitely be a thrill.
* This bridge is planned for completion by 2019. The photo indicated that piers and slab are complete and the 2 main pillars are in progress. With more than
...
more...
1,300 workers and 300 engineers working round-the-clock under the strict supervision of Konkan Rly Engineers, RM & PMO, we have reason to believe that bridge shall be completed by 2019.
* This bridge shall add one more superlative to Indian Railways in addition to many like No.1 passenger transporter, Cheapest passenger, transporter, Large number of trains operated etc.

  
1339 views
Aug 15 2017 (13:06)
Mazi IRI~   832 blog posts
Re# 2321197-2            Tags   Past Edits
Good to see that work is well progressed...

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Fri Dec 22
Trains with ARP 15 Dep on: Wed Dec 27
Trains with ARP 30 Dep on: Thu Jan 11
Trains with ARP 120 Dep on: Wed Apr 11

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.