Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Oct 18, 2017 13:11:49 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Oct 18, 2017 13:11:49 IST

Blog Entry# 2321789
Posted: Jun 15 2017 (18:02)

1 Responses
Last Response: Jun 15 2017 (18:02)
  
Rail News
0 Followers
350 views
ML/Mumbai Local  -  
Jun 15 2017 (12:58)   New AC rakes to accommodate 10% more passengers; tenders likely in September: Mumbai Rail Vikas Corporation

Jayashree   37980 news posts
Entry# 2321789   News Entry# 305439         Tags   Past Edits
The 47 rakes will be procured under the phase III of the Mumbai Urban Transport Project (MUTP)
NEW AIR-CONDITIONED suburban train rakes, to be procured by 2020, will be able to intake 10 per cent more passengers in each coach in comparison to the existing rakes, officials from the Mumbai Rail Vikas Corporation (MRVC) said. Technical design of the rake will be modified in such a way that it would increase the passenger capacity of coaches.
The 47 rakes will be procured under the phase III of the Mumbai Urban Transport Project (MUTP).
...
more...
After the Railway Board gave its consent on the air-conditioning of the rakes last month, officials have been deliberating over the technical design of the rakes, which include different compartments to be included and routes on which they can run.
“Different specifications like a metro-rake type model which includes gangway corridors, absence of motor coaches and wider passenger coaches will help in better intake. An automatic door closing system will ensure a systematic network for commuters to stand inside the coaches,” a senior MRVC official said.
At present, the Central Railway runs 1,660 trips while Western Railway caters to 1,306 trips per day in the suburban system. “More demand of services in the last few years sees increased crowd per coach in trains. Through automatic door closing system and wider coaches, we will will ensure a reduction of accidents and fatalities of commuters through falling down from running trains by at least 25 per cent on a daily basis,” the official added.
The new trains will be run on all the three lines – Main and Harbour line on the CR and Western line. A decision on the line on which a prototype rake could run is yet to be taken as that would determine its compatibility with the suburban system. The rakes are expected to contain three compartments earmarked for ladies, one coach for disabled and two coaches at both ends of the train for luggage compartment. Officials are deliberating whether AC coaches should be retained for the luggage compartment considering the presence of perishable food items.
“As it would be a centralised AC system, retaining AC in the coaches for commuters carrying luggage and foodstuff could prove to be a disadvantage to others as the smell of food could spread across coaches. We are looking at options to ensure how the problem could be avoided,” the official added.
The coaches of the rakes will be manufactured in the Integral Coach Factory after a vendor for manufacturing electrics for the rakes is finalised. Tenders will be floated worldwide to invite companies with the latest technology.
“The rakes will be manufactured only after the technology with which the conditioning needs to be done gets decided. We are expecting to float the tenders by September,” the official added. The cost of manufacturing per coach will be around Rs 3 crore, lesser than Rs 8-9 crore per coach of a metro rake, the official said.

  
786 views
Jun 15 2017 (18:02)
a2z~   2143 blog posts
Re# 2321789-1            Tags   Past Edits
Suburban Rakes EMUs have wider coaches (16"wider) than conventional coaches, as the spacing between parallel lines is kept accordingly. ac EMU coaches too should be wider like non ac EMUs so that more paxs can be accommodated.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Oct 28
Trains with ARP 15 Dep on: Thu Nov 2
Trains with ARP 30 Dep on: Fri Nov 17
Trains with ARP 120 Dep on: Thu Feb 15

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment" have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are an integral...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.