Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sun Oct 22, 2017 01:10:44 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun Oct 22, 2017 01:10:44 IST

Blog Entry# 2322986
Posted: Jun 16 2017 (18:07)

1 Responses
Last Response: Jun 16 2017 (18:07)
  
Rail News
0 Followers
1264 views
Other News
Jun 16 2017 (17:28)   lucknow-kashi: Lucknow-Kashi railway route to be congestion-free by October | Lucknow News

Jayashree   38008 news posts
Entry# 2322986   News Entry# 305555         Tags   Past Edits
LUCKNOW: The congestion problem on Varanasi-Lucknow route is likely to end by October end, said member, traffic, Railway Board, Mohammad Jamshed. Talking to TOI, he said that the route was much beyond its saturation capacity which was leading to delays and trains getting stranded on the outer signal.
"Against the capacity to run 55-60 trains, this route is handling the traffic of more than 90 trains. Add to it an abundance of goods trains and special trains and the burden is staggering. But, it should all end when the doubling of Uthrathiya-Jafrabad section is completed and the entire Varanasi-Lucknow route is doubled up by October end. Besides, after the inauguration of a dedicated freight corridor would further take the burden off," he
...
more...
told TOI.
"Punctuality is certainly an issue and we are working on improvement," said Jamshed, who was in Lucknow on Thursday to attend the valedictory function of the passing out ceremony at Indian Railways Training Institute. He also reviewed safety measures and other amenities at Lucknow stations. He was accompanied by Northern Railway chief commercial manager Devesh Mishra.
The length of Uthrathiya-Varanasi route is 271 Km long, of which only 212 Km of route track has been doubled up while the work of rest Chandrauli-Adheenpur route length of 58.66 km is under way. The construction of second route track on these lines will reduce the traffic on outer sections of Charbagh railway station. As of now, trains have to wait for the route clearance. It eventually adversely affects the traffic on the Lucknow-Kanpur-Delhi and Lucknow-Bareilly-Delhi routes as well.
At present, around 166 mail and express and 22 passenger trains are running on this route. Besides, there are around 18 freight trains. However, Jamshed has said that after the inauguration of freight corridor, the load of goods trains would also be reduced which would give relief to passengers in terms of punctuality.

  
1996 views
Jun 16 2017 (18:07)
I am a Visitor Admin Member on IRI*^~   9033 blog posts   1 correct pred (33% accurate)
Re# 2322986-1            Tags   Past Edits
So once the Chandrauli - Adheenpur Route Length of 58.66 km is doubled (and electrified too) then the entire route may become fit to speed up LHB trains like Durgiana Express. If the MPS becomes something between 115 to 120 Kmph then the travel time between BSB and LKO via SLN should come down to 4.5 to 5 Hours. Right? :) #TrackReforms

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed Nov 1
Trains with ARP 15 Dep on: Mon Nov 6
Trains with ARP 30 Dep on: Tue Nov 21
Trains with ARP 120 Dep on: Mon Feb 19

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment" have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are an integral...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.