Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sun Oct 22, 2017 13:40:03 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun Oct 22, 2017 13:40:03 IST

Blog Entry# 2323680
Posted: Jun 17 2017 (11:23)

6 Responses
Last Response: Jun 21 2017 (20:13)
  
General Travel
0 Followers
2230 views
Jun 17 2017 (11:23)   NJP/New Jalpaiguri Junction (8 PFs)

debarathi mandal   5181 blog posts   12084 correct pred (89% accurate)
Entry# 2323680            Tags   Past Edits
Electrification update of MLDT-NJP section....current progress update
Electrification work reached upto Up distance signal of NJP....Up line mai pole install ho gaya bridge tak and single wire bhi lag gaya.....
Down line mai bhi pole bridge tak chala gaya
Hope work complete soon within 1.5 year maximum

1 posts - Sat Jun 17, 2017

  
1785 views
Jun 17 2017 (21:57)
debarathi mandal   5181 blog posts   12084 correct pred (89% accurate)
Re# 2323680-2            Tags   Past Edits
Yes.

  
1517 views
Jun 18 2017 (09:12)
Ashutosh Singh   83 blog posts
Re# 2323680-3            Tags   Past Edits
It can never be completed by the time stated by you.
PKR-MLDT is expected to be completed by 31st March 2019. We can set a timeframe for KIR-NJP & MLDT- NJP only when electrification works starts at the station's i.e. MLDT & NJP.
NFK & MLDT & NJP station's doesn't have a single pole how can you say that within 1.5 yrs it will be completed.

  
1500 views
Jun 18 2017 (09:14)
debarathi mandal   5181 blog posts   12084 correct pred (89% accurate)
Re# 2323680-4            Tags   Past Edits
Ap jo bol raha hai o 5 sal pahale tara bat bol raha hai....apne last 1.5 year me kaya kam hua HWH-NJP Section me o ekbar pahale dekh lo....then comment
last 5 year me jo kam hua uska 90%+ work last 1-1.5 years me hua

  
1553 views
Jun 18 2017 (09:18)
subhasishgoswami00   41 blog posts   1 correct pred (100% accurate)
Re# 2323680-5            Tags   Past Edits
He is right. Maine kuch din pahle is section Ko dekha. Bahat Kam ho gya hai

  
1148 views
Jun 21 2017 (20:13)
Ashutosh Singh   83 blog posts
Re# 2323680-6            Tags   Past Edits
Matlab BJP aane se kaam speed up Hua hai..
Kuch v ho par pehle PKR-MLDT ka electrification main hai par iska progress bahut kharab hai. Mera point hai koi v main station par kaam start nai hua jaise NFK/MLDT/NJP aur ye sab station ko electrification karke train chalana 2020 ke pehle to possible nai hai.
Aur KIR-NJP ka v wahi time lag sakta at least 31st March 2020.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed Nov 1
Trains with ARP 15 Dep on: Mon Nov 6
Trains with ARP 30 Dep on: Tue Nov 21
Trains with ARP 120 Dep on: Mon Feb 19

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.