Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Full Site Search  
 
Tue Sep 25 21:05:33 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Gallery
News
FAQ
Trips
Login
Feedback
PostPost Trn TipPost Stn TipAdvanced Search

Blog Entry# 2324388
Posted: Jun 17 2017 (22:54)

1 Responses
Last Response: Jun 17 2017 (22:54)
  
Rail News
0 Followers
760 views
Other News
Jun 17 2017 (16:54)   Indian Railways to order 25 high speed trains

Jayashree ❖ Amita*^   41071 news posts
Entry# 2324388   News Entry# 305680         Tags   Past Edits
INDIA: A 10-car variant of JR East’s Series E5 Shinkansen trainset has been selected to operate the country’s first high speed line between Mumbai and Ahmedabad, according to the Ministry of Railways. Indian Railways is expected to order an initial build of 25 trains at an estimated cost Rs50bn.
Construction of the 508 km line is due to get underway in 2018, following a groundbreaking ceremony which is expected to take place during a visit by Japanese Prime Minister Shinzo Abe later this year. Completion is envisaged for 2023. Geological surveys began in February, following the signing last December of an accord between the government, the National High Speed Rail Corp and Japan International Co-operation Agency.
Most
...
more...
of the 1 435 mm gauge line would be elevated, apart from a 21 km underground section north of Mumbai including a 7 km undersea tunnel. There would be 11 stations, of which four would be located in Maharashtra and seven in Gujurat.
Each trainset would have 698 seats for standard class passengers and 55 seats for business class. There would be two wheelchair-accessible toilets and separate facilities for men and women in alternate vehicles. Baby changing facilities are also to be provided.
Operating at a maximum speed of 350 km/h, ‘rapid’ trains are expected to link Mumbai and Ahmedabad in 2 h 7 min, with two stops at Surat and Vadodara. Stopping services calling at all stations are expected to take 2 h 58 min. IR is planning to run 35 services each way per day, with two per hour off peak and three in the peaks; the line is forecast to carry around 36 000 passengers/day in the first year.
Total cost of the project is put at Rs1 070bn, of which 81% will be funded by JICA through a 50-year low-interest loan. The local contribution will be channelled through NHSRC, which is a special purpose vehicle owned 50% by IR and 25% each by the two state governments. IR has already contributed Rs20bn to cover preliminary works, and earlier this year the national government signed an MoU with Gujurat releasing Rs770m for its share.

1 Public Posts - Sat Jun 17, 2017

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Fri Oct 5
Trains with ARP 15 Dep on: Wed Oct 10
Trains with ARP 30 Dep on: Thu Oct 25
Trains with ARP 120 Dep on: Wed Jan 23

  
  

Rail News

New Trains

Site Announcements

  • Entry# 3710716
    Aug 14 2018 (11:04AM)


    This is regarding the appointment of Monitors. For TLMs, we require a minimum of 1000 Confirmed TLs. For FMs, we require members to promise to abide by the guidelines and be free of controversies. For other Monitors, we require the member to be in good standing. . However, "eligibility" does NOT always mean...
  • Entry# 3645007
    Jul 20 2018 (03:28PM)


    This is an advance notice of an upcoming change: 1. We shall be removing the Login/Forum section from the RailCal app as it is cumbersome, buggy and lacking in features. . 2. We shall soon be introducing a dedicated app called "Rail Messenger" for both Android and iOS, for all blogging/messaging purposes. The app...
  • Entry# 3644431
    Jul 20 2018 (12:42PM)


    The following changes are being made: 1. To restore the fun back to PNR Predictions, PNR Predictions will NOT be hidden anymore. PNR Predictions by members can be seen by ALL, before and after Charting. New members often look towards our expert predictors for hints, and we are reinstanting that. . 2. To better...
  • Entry# 3601043
    Jul 04 2018 (12:36PM)


    @all: While we do nominally allow multiple IDs, these multiple IDs are NOT allowed to engage in misuse and "mischief". Voting multiple times in the same poll using multiple IDs, rating each other IDs' blogs using multiple IDs, etc. are classified as "gross misuse". . This is an advance notice that some of the...
  • Entry# 3555168
    Jun 20 2018 (10:33PM)


    @all: IRI is a PUBLIC information website, like Wikipedia. The voluntarily posted Blogs, Train/Station Tips, Train/Station Pics, Polls, Train TTs, PNRs, etc. comprise the permanent publicly viewable and searchable repository of IRI. A PUBLIC info website is unlike WhatsApp, FaceBook, Instagram, etc. where people post personal pics and other stuff, which CAN...
  • Entry# 3535285
    Jun 15 2018 (08:28PM)


    This is a clarification to all members regarding our Forum Guidelines and the FM Group. SWs are issued for very clear cases of abuse and misbehaviour by a member. . At this time, we have had many members against whom SW is issued claim that: "I am a long-time member of IRI, and have...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy