Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sun Oct 22, 2017 21:17:03 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun Oct 22, 2017 21:17:03 IST

Blog Entry# 2324388
Posted: Jun 17 2017 (22:54)

1 Responses
Last Response: Jun 17 2017 (22:54)
  
Rail News
0 Followers
468 views
Other News
Jun 17 2017 (16:54)   Indian Railways to order 25 high speed trains

Jayashree   38030 news posts
Entry# 2324388   News Entry# 305680         Tags   Past Edits
INDIA: A 10-car variant of JR East’s Series E5 Shinkansen trainset has been selected to operate the country’s first high speed line between Mumbai and Ahmedabad, according to the Ministry of Railways. Indian Railways is expected to order an initial build of 25 trains at an estimated cost Rs50bn.
Construction of the 508 km line is due to get underway in 2018, following a groundbreaking ceremony which is expected to take place during a visit by Japanese Prime Minister Shinzo Abe later this year. Completion is envisaged for 2023. Geological surveys began in February, following the signing last December of an accord between the government, the National High Speed Rail Corp and Japan International Co-operation Agency.
Most
...
more...
of the 1 435 mm gauge line would be elevated, apart from a 21 km underground section north of Mumbai including a 7 km undersea tunnel. There would be 11 stations, of which four would be located in Maharashtra and seven in Gujurat.
Each trainset would have 698 seats for standard class passengers and 55 seats for business class. There would be two wheelchair-accessible toilets and separate facilities for men and women in alternate vehicles. Baby changing facilities are also to be provided.
Operating at a maximum speed of 350 km/h, ‘rapid’ trains are expected to link Mumbai and Ahmedabad in 2 h 7 min, with two stops at Surat and Vadodara. Stopping services calling at all stations are expected to take 2 h 58 min. IR is planning to run 35 services each way per day, with two per hour off peak and three in the peaks; the line is forecast to carry around 36 000 passengers/day in the first year.
Total cost of the project is put at Rs1 070bn, of which 81% will be funded by JICA through a 50-year low-interest loan. The local contribution will be channelled through NHSRC, which is a special purpose vehicle owned 50% by IR and 25% each by the two state governments. IR has already contributed Rs20bn to cover preliminary works, and earlier this year the national government signed an MoU with Gujurat releasing Rs770m for its share.

  
861 views
Jun 17 2017 (22:54)
Guest: 606a7ace   show all posts
Re# 2324388-1            Tags   Past Edits
First bullet train of IR 😊

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed Nov 1
Trains with ARP 15 Dep on: Mon Nov 6
Trains with ARP 30 Dep on: Tue Nov 21
Trains with ARP 120 Dep on: Mon Feb 19

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.