Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Full Site Search  
 
Wed Jun 20 09:57:34 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Gallery
News
FAQ
Trips
Login
Feedback
PostPost Trn TipPost Stn TipAdvanced Search

Blog Entry# 2324388
Posted: Jun 17 2017 (22:54)

1 Responses
Last Response: Jun 17 2017 (22:54)
  
Rail News
0 Followers
656 views
Other News
Jun 17 2017 (16:54)   Indian Railways to order 25 high speed trains

Jayashree   40212 news posts
Entry# 2324388   News Entry# 305680         Tags   Past Edits
INDIA: A 10-car variant of JR East’s Series E5 Shinkansen trainset has been selected to operate the country’s first high speed line between Mumbai and Ahmedabad, according to the Ministry of Railways. Indian Railways is expected to order an initial build of 25 trains at an estimated cost Rs50bn.
Construction of the 508 km line is due to get underway in 2018, following a groundbreaking ceremony which is expected to take place during a visit by Japanese Prime Minister Shinzo Abe later this year. Completion is envisaged for 2023. Geological surveys began in February, following the signing last December of an accord between the government, the National High Speed Rail Corp and Japan International Co-operation Agency.
Most
...
more...
of the 1 435 mm gauge line would be elevated, apart from a 21 km underground section north of Mumbai including a 7 km undersea tunnel. There would be 11 stations, of which four would be located in Maharashtra and seven in Gujurat.
Each trainset would have 698 seats for standard class passengers and 55 seats for business class. There would be two wheelchair-accessible toilets and separate facilities for men and women in alternate vehicles. Baby changing facilities are also to be provided.
Operating at a maximum speed of 350 km/h, ‘rapid’ trains are expected to link Mumbai and Ahmedabad in 2 h 7 min, with two stops at Surat and Vadodara. Stopping services calling at all stations are expected to take 2 h 58 min. IR is planning to run 35 services each way per day, with two per hour off peak and three in the peaks; the line is forecast to carry around 36 000 passengers/day in the first year.
Total cost of the project is put at Rs1 070bn, of which 81% will be funded by JICA through a 50-year low-interest loan. The local contribution will be channelled through NHSRC, which is a special purpose vehicle owned 50% by IR and 25% each by the two state governments. IR has already contributed Rs20bn to cover preliminary works, and earlier this year the national government signed an MoU with Gujurat releasing Rs770m for its share.

1 Public Posts - Sat Jun 17, 2017

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Jun 30
Trains with ARP 15 Dep on: Thu Jul 5
Trains with ARP 30 Dep on: Fri Jul 20
Trains with ARP 120 Dep on: Thu Oct 18

  
  

Rail News

New Trains

Site Announcements

  • Entry# 3535285
    Jun 15 (08:28PM)


    This is a clarification to all members regarding our Forum Guidelines and the FM Group. SWs are issued for very clear cases of abuse and misbehaviour by a member. . At this time, we have had many members against whom SW is issued claim that: "I am a long-time member of IRI, and have...
  • Entry# 3444356
    May 23 (12:09PM)


    @all: With the introduction of the pre-moderation scheme for new IDs described here Blog Entry# 3443990-1 and Entry# 3441062 , following is a summary of Forum Guidelines in effect: . 1. Blog Posts by new IDs appear in public ONLY AFTER scrutiny and approval by FMs. A member may create as many Fake IDs as...
  • Entry# 3441062
    May 22 (12:51PM)


    The system detailed here Blog Entry# 3440635 will be rolled out soon. Meanwhile, immediately, to curb the menace of fake IDs, starting tomorrow, all blog posts from New Members will be "PRE-moderated". . What this means is that, UNTIL the member acquires at least 10 public positive Ratings - Great/Thanks, etc. . 1. ALL posted blogs...
  • Entry# 3440635
    May 22 (10:04AM)


    To curb the proliferation of duplicate IDs in IRI, we shall soon be requiring SMS-based authentication to post blogs. . Members will be required to provide a mobile phone number to authenticate their accounts. An OTP will be sent to the number. Upon entering the OTP, the account will be associated with that...
  • Entry# 3416383
    May 14 2018 (12:40PM)


    This an advance announcement of some important changes coming to our Groups. . Pl. read Entry# 2136570 posted more than a year ago. Subsequent to this, some long-pending changes will be introduced in the coming weeks. . At this point, we have many Groups with hundreds of dormant/inactive members who may have left the site...
  • Entry# 3416198
    May 14 2018 (10:27AM)


    The following features have been introduced. Pl. check the relevant screenshots. 1. While Posting News, a new "Fetch Article" button has been added. After you paste the URL in the box, clicking the button will fetch the News Title, Article and all the pics from the page. The Article and Title will...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy