Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Oct 19, 2017 09:17:56 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Oct 19, 2017 09:17:56 IST

Blog Entry# 2326193
Posted: Jun 19 2017 (17:35)

2 Responses
Last Response: Jun 19 2017 (17:54)
  
Train commuters from north travelling to the eastern region of the country were the ones who are said to be most affected by train delays in the month of May, 2017.
.
Train commuters from north travelling to the eastern region of the country were the ones who are said to be most affected by train delays in the month of May, 2017. The official data, collected by The Indian Express, stated that of the 19,450 trains that failed to report to its destinations on time (between May 1 to May 30), around
...
more...
11,600 – or 59.64 per cent – where from UP’s North Central Railway, Bihar’s East Central Railway, North Eastern Railway, Kolkata-based Eastern Railway and the New Delhi-based Northern Railway. When inquired about the prime reasons behind these delays, records said that these trains were halted due to causes within the control of the Railways department such as collateral damages, track issues, operational glitches and the ongoing maintenance works.
.
Even best considered trains of the country including Rajdhani trains, which runs of priority of path, were affected by these delays. Compared to the same period last year, the punctuality rate of Rajdhani trains are said to have dipped by 8.61 per cent to 78 per cent in April-May.
.
The report also listed some other prominent trains catering to the east were hit by these delays in April-May. The names include:
.
i. Shramjeevi Express – one of the most opted superfast train connecting New Delhi to Rajgir in Bihar via Varanasi and Patna, was delayed by more than one hour some 22 days in May, clocking a punctuality rate of 4 per cent.
.
ii. Magadha Express – considered to be one of the oldest trains linking New Delhi to Islampur in Bihar, logged almost a ‘zero percent’ punctuality rate during this period.
.
iii. Not just in May, but the situation were similar in June, too, with the Northeast Express, connecting New Delhi to Guwahati via Bihar running 14 hours behind schedule on June 8. On the same day, the Anand Vihar-Bhagalpur Garib Rath Express reached its destination 10 hours late.
.
Speaking to Indian Express on the condition of anonymity, Railway officials said that these delays, which often stretched to 15 hours, marked the worst performance by the Indian Railways in the recent year, excluding the fog-hit months of winter season. Justifying the delays, Railway Board Member (Traffic), Mohammad Jamshed said that the east-bound trains ran late because of the speed restrictions imposed due to a lot of planned work on the tracks related to maintenance and capacity augmentation.
.
“Trains, especially to eastern India, are getting delayed. That’s why our overall punctuality has taken a hit. But that’s mostly because a lot of planned work of doubling of lines as well as maintenance are going on for which trains have to run as slow as 20 km per hour at various stretches,” Jamshed said.
.
“This pain is temporary as work on capacity augmentation and maintenance are necessary and cannot be taken up once the monsoon sets in,” he added further.
.
The Railways has 33 categories of reasons for delays and seven out of them are not in its control. These reasons are alarm chain being pulled, protests on the tracks, bad weather, accidents, and law and order. The report further stated that in May only 8 per cent of the delays were due to the planned work, whereas 10.22 per cent of the delays were due to track related issues which include maintenance and safety-related speed restrictions
.
“Then there are causes over which we have no control, like when the Maoists called a bandh in the Dhanbad division for 10 days. Security agencies advised us to run at reduced speeds in those areas. Once a train gets delayed, it has a rippling effect on all other trains, creating a loop of late trains,” Jamshed said.
.
However, the data reflects that in May only 3.04 per cent trains were delayed due to law and order problems. According to Railways rules, a user can see train-running status of only up to two days, but records examined shows that the worst graph during the April-May was that of Hajipur (Patna)-based East Central Railway, which services Bihar and Jharkhand. As per the arrival data of this region, the punctuality rate dipped to almost 50 per cent during this time which means every second Bihar- Jharkhand train was running late.
.
Here is the punctuality details of other sectors in the east for April-May period:
.
i. Kolkata-based Eastern Railway marked a punctuality rate of around 69.8 per cent, which is a 7.9 per cent dip compared to the same period last year.
.
ii. Gorakhpur-based North Eastern Railway, which includes Lucknow and Varanasi divisions, dipped by 7.9 per cent to clock 63 per cent punctuality.
.
iii. Guwahati-based Northeast Frontier Railway’s punctuality rate was clocked at 74 per cent which is again a dip of 8.4 per cent from this period last year.
.
East Central Railways general manager, DK Gayen Indian Express, “Yes, there are delays. But whenever capacity augmentation work takes place, various speed restrictions come in because of which trains have to run at low speeds. It’s temporary. If you see, the situation has started getting back to normal in the past two-three weeks.”

  
6345 views
Jun 19 2017 (17:35)
Ajay Shankar Pandey   57 blog posts
Re# 2326193-1            Tags   Past Edits
ALL GMs are making people fool. Real research shows 12401/02 Magadh Exp running late more than 4 to 5 hours since 2010 delayed only due to least preference train declared internally by North Central railay, Northern railway and East Central Railway. According to one agency, it punctuality rate -365 & 12391 Shramjeevi Exp earlier running almost RT and punctuality rate was more than 80 % but last 3 months Northern Railway Delhi is not ready to take before 9 am because there is washing line and pit line problem in Delhi hence they took at 9.00 instead of 5 am and send directly to secondary maintenance. Main delay area , Lucknow outer 1 hours to 2 hours and Moradabad =Delhi one hour to 1.30 hrs, total late: 3 hours to 4 hours daily. Poor efficiency of controller and lack Guard and Drivers are mainly responsible for all delayed in Eastern bound...
more...
trains.

  
6381 views
Jun 19 2017 (17:54)
DQ is the best   703 blog posts   162 correct pred (66% accurate)
Re# 2326193-2            Tags   Past Edits
What is the situation in rest of India?

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Oct 29
Trains with ARP 15 Dep on: Fri Nov 3
Trains with ARP 30 Dep on: Sat Nov 18
Trains with ARP 120 Dep on: Fri Feb 16

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment" have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are an integral...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.