Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri Oct 20, 2017 14:33:08 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Oct 20, 2017 14:33:08 IST

Blog Entry# 2326905
Posted: Jun 20 2017 (14:53)

2 Responses
Last Response: Jun 20 2017 (15:12)
  
Rail News
0 Followers
481 views
ECoR/East Coast  -  
Jun 20 2017 (13:33)   Rail minister commissions new line to Nayagarh in Odisha

Jayashree   37999 news posts
Entry# 2326905   News Entry# 305944         Tags   Past Edits
BHUBANESWAR: Nayagarh was put on the railway map of the country Monday when railway minister Suresh Prabhu formally dedicated the new line from Bolagarh Road to Nayagarh as part of the ongoing Khurda Road-Balangir project.
Prabhu commissioned the 12.8 km line formally by video link from New Delhi.
Apart from unveiling the line, the railway minister also inaugurated the Nayagarh Town Station building while flagging off a passenger train that made the first journey to the town.
The
...
more...
Bolagarh-Nayagarh stretch comprises 28 minor and three major bridges and 13 road overbridges which required 267.23 acres of land. The Railways has spent about Rs 85 lakh on the construction of the Bolagarh passenger halt.
The extension of the new section will give a boost to the ongoing work for the much-delayed Khurda Road-Balangir Road railway line measuring 289 km. Sanctioned in 1994-95, the commission of the line started two years ago with the 36 km Khurda Road-Begunia on July 19, 2015.
The ECoR has set an ambitious target of extending the line by 40 km at both ends by March next year. It plans to connect Nayagarh to Nuagaon with a line of about 25 km and another 14.9 km from Balangir to Baisipalli.
The total cost of the 289 km project is estimated at Rs 3005 crore. So far, the Railways have spent close to Rs 801.7 crore. “The Odisha government is not only providing free land for the project, it will also bear half of the construction cost between Dasapalla and Balangir for about 177 km. The project is expected to be completed by June 2021.
With the new line extended till Nayagarh, the Nayagarh Town-Khurda Road passenger train will leave Nayagarh at 5 am and reach Khurda Road at 7 am. In the return direction, the train will leave Khurda Road at 7.35 pm and reach Nayagarh Town at 9.30 pm
Similarly, the Khurda Road-Nayagarh Town passenger train will depart from Khurda Road at 7.45 am and reach Nayagarh at 9.30 am. In the return direction, it will leave Nayagarh at 10 am and reach Khurda Road at 11.30 am.
Union minister Dharmendra Pradhan and Bhubaneswar MP Prasanna Patsani were present with Prabhu at New Delhi for the function. At the inauguration function of the Nayagarh Road Station, local MLA Arun Sahoo, divisional railway manager of Khurda Road Brijmohan Agrawal and CEO of ECoR RS Dubey were present.

  
1304 views
Jun 20 2017 (14:53)
a2z~   2143 blog posts
Re# 2326905-1            Tags   Past Edits
After struggling for several years, the E-W connectivity project KhurdaRd-Bolangir new line project has finally gathered momentum and we can expect completion in next 4-5 years.
* 1945-Survey conducted for KhurdaRd-Bolangir new rail line
* 1994-95- Project sanctioned- but didnot pickup due to lack of funds
* 2016-36kms long KhurdaRoad-Begunia- First phase commissioned (it took more than 2 decades for first section to
...
more...
be commissioned)
* 2017-32 kms long Begunia-Nayagarh- (Part of second phase-76kms long Begunia-Daspalla section) commissioned(Total 68 kms commissioned)
* march'2018- 25 kms Nayagarh-Naugarh (part of second phase) & 15km Bolangir-Baisipalli (part of third phase-177km long Daspalla-Bolangir section) (Total 116 kms shall be commissioned)

  
1237 views
Jun 20 2017 (15:12)
Guest: 39090a09   show all posts
Re# 2326905-2            Tags   Past Edits
great work by prabhu

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Oct 30
Trains with ARP 15 Dep on: Sat Nov 4
Trains with ARP 30 Dep on: Sun Nov 19
Trains with ARP 120 Dep on: Sat Feb 17

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment" have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are an integral...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.