Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Dec 14, 2017 06:13:34 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Dec 14, 2017 06:13:34 IST

Blog Entry# 2342742
Posted: Jul 05 2017 (12:34)

No Responses Yet
  
General Travel
0 Followers
760 views
Jul 05 2017 (12:34)   BKSC/Bokaro Steel City (3 PFs)

Divert ShalimarGorakhpur Express via BKSC*^~   5349 blog posts   5034 correct pred (76% accurate)
Entry# 2342742            Tags   Past Edits
The milch cow for the division 'BKSC' will never see the days of 'work completed on time'. Every project initiated here has crossed the deadline twice the time provided. The work for escalator and lift started in 2015 which is way before than few stations but it is still not functional . There is no sign of progress these days and everything has been left in between whereas those station which started the work and were provided fund later are enjoying escalator facility. It is 2017 , I believe 2 years is enough time to complete at least one escalator out of two, correct me if I am wrong about this. Seeing the condition, the escalators are expected to be functional by end on 2018 and lifts to be functional in 2019. Moreover, see the front structure demolished to make way for space frame which was inaugurated last year by RM...
more...
and fund was sanctioned but the division was sleeping by ingesting the money secretly. This is making the station look really bad and dark in night with no proper lights. I filed a grievance on pgportal regarding this by citing the tender number and as a result the division responded by sending a letter of quick action in progress. As a result, the front structure was demolished along with lights making the building look dilapidated and dark. That is all, that the progress they made after my complain and everything is back to the usual scene. The problem is that there is no strict monitoring done for the works being done because those officials sit in ADRA and there is no one to monitor the work locally. This amount of delay is not justified and expected for the station which is giving you the largest share in total revenue generated. No new trains, no long distance connectivity, no local connectivity, no on time completion of works, no new platform since the inception of station and PRR, BQA getting new platforms. I expect the division to pay more attention to BKSC because we don't ask for alms, we ask for what we deserve.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Dec 24
Trains with ARP 15 Dep on: Fri Dec 29
Trains with ARP 30 Dep on: Sat Jan 13
Trains with ARP 120 Dep on: Fri Apr 13

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.